Sewerage Work – Plb Reinforcement Work Between R4 And R5 - Interface With Line 15 Est-2 Of The Gpe. The Operation Concerns The Structural Reinforcement Of The Plb Dn2500 Collector, Located In The Town Of Aubervilliers, Upstream Of The Passage Of The Tunnel Boring Machine For Line 15 East Of The Grand Paris Express. The Aim Of The Work Is To Strengthen The Structure In Order To Guarantee Its Structural Strength And Its Durability During The Passage Of The Tunnel Boring Machine Of Line 15 East-2 Between December 2026 And February 2027. The Main Interventions Include: · Carrying Out Bonding Injections With A Regenerating Effect Over The Entire Relevant Perimeter Of The Structure, I.E. Over 50 Ml (R4+69M To R4+119M); · Structural Reinforcement Of The Impacted Area, By Spraying Reinforcing Concrete (Thickness 6 Cm) Over 35 Ml (R4+76.5M To R4+111.5M); · A Piped Reprofiling Of The Lined Area Over 15 Ml (7.5 Ml On Either Side Of The Impacted Zone) To Ensure The Geometric And Hydraulic Continuity Of The Collector; · Flexible Recovery Of Cracks In The Impacted Area (Approximately 150 Ml, Depending On The Condition Of The Base) Intended To Treat Occasional Disorders And Maintain The Watertightness Of The Collector
Contact Information
Address
2 Rue Jules César
Contact No.
0144754426
Email
marchesiaap@siaap.fr
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106900293
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.