|
Boiler Installations – Restoration Of The Heating Plant Source. The Subject Of The Performance Of The Public Order Is A Functional Work Consisting In The Realization Of All Supplies Of Goods, Works And Services Connected With The Construction Of A Steam-Gas Cycle In The Grounds Of The Clients Heating Plant. The Public Order Will Have The Character Of A Turnkey Supply And Will Be Performed In Accordance With The Requirements, Conditions, Specifications And Other Data And Information Contained In Detail In Books A And B Of The Zd. Basic Scope Of The Work - The Contracting Authority Assumes The Following Basic Scope Of The Work Constituting The Public Order: A. Processing Of The Documentation Necessary For The Implementation Of The Work, In Particular Documentation In The Scope Of Decree No. 131/2024 Coll., On The Documentation Of Buildings, As Amended, And Other Documentation, Including Those Necessary For The Supply Of Goods, Services And Other Activities Connected With The Implementation Of The Work, Including Its Testing, Commissioning And Handing Over To The Contracting Authority, And B. Possible Demolition And Removal Of Existing Buildings, Networks And/Or Equipment At The Place Of Execution Of The Work, Including Necessary Related Conversions Of Existing Buildings, Networks And/Or Equipment Of The Contracting Authority, Which Must Not Be Affected By The Execution Of The Work, All To The Extent Necessary For The Execution Of The Work, And C. Installation And Commissioning Of The Gas Turbine Including Accessories, And D. Supply, Installation And Commissioning Of The Natural Gas Compressor Station, And E. Complete Construction Part, And F. Delivery, Installation And Commissioning Of The Combustion Boiler Including The Related Construction Part, Accessories And Pipe Connections, Electrical Connections, All According To The Proposal Of The Supplier (Contractor) In Accordance With The Requirements Of The Tender Documentation, And G. Execution Of Follow-Up Services Related To The Work, Such As In Particular Coordination Of The Work, Insurance, Procurement Of Decisions Of Administrative Authorities In Connection With The Execution Of The Work, Training Of The Clients Staff, Quality Control And Assurance Of Health And Safety During The Execution Of The Work, And H. Delivery And Commissioning Of The Control System Necessary For The Management Of The Entire Steam-Gas Cycle, Including Connection To Information System Of The Contracting Authority, And I. Supply And Installation Of Electrical Substation Equipment And A Transformer Station For The Output Of Electrical Power To The Vvn Network. A More Detailed Description Of The Subject Of Performance Is Provided In The Tender Documentation.
|