|
The Scope Of Work Includes: - Demolition And Dismantling Works, Including Waste Removal And Disposal; - Construction And Masonry Works, Including The Construction And Bricking Of Openings, Lintels And Partition Walls; - Construction Of Floors With Moisture, Heat And Acoustic Insulation As Well As Finishing Layers; - Finishing Of Walls And Ceilings, Including Plasters, Plasters, Cladding, Painting And Suspended Ceilings; - Installation Of Joinery Windows And Doors And Accompanying Elements; - Execution Of Sanitary Installations, Including: - Installation Of Sanitary Sewage Systems, Including Approaches And Tightness Tests, - Installation Of Cold, Hot And Fire-Fighting Water Along With Hydrants, - Installation Of Sanitary Equipment, Including Equipment For People With Disabilities; - Execution Of A Central Heating Installation With A Heat Source, Fittings, Radiators, Tightness Tests And Regulations; - Execution Of A Gas Installation, Including A Pre-Meter Connection, Works Earthworks, Gas Pipeline Assembly, Route Marking And Tightness Testing; - Execution Of Electrical And Telecommunications Installations, Including Switchboards, Power Lines, Basic, Emergency And Evacuation Lighting Installations, Plug Sockets, Accessories, Lighting Fixtures And Required Measurements And Tests; - Execution Of Tests, Examinations, Adjustments, Flushing And Disinfection Of The Installation; - Accompanying, Auxiliary, Reconstruction And Cleaning Works Necessary For Proper And Complete Execution Zamówienia.Zakres Prac Będzie Realizowany W Budynku Byłego Przedszkola Przy Ul. Przemysłowa 1 In Tarnobrzeg - Plot No.: 521/5 Located In Tarnobrzeg, District 0010 Zakrzów. Note: The Order Is Co-Financed By The Regional Program European Funds For Podkarpacie For 2021-2027 From The European Regional Development Fund. The Detailed Material Scope Of The Subject Of The Order Was Specified In The Construction Design, Detailed Design And Technological Design, Decyzji Pozwolenia Na Budowę Oraz Warunkach Swz Wraz Z Załącznikami.
|