|
1. The Subject Of The Order Is The Expansion And Reconstruction Of The Sewage Treatment Plant In Płościca - Stage Ii - Plot No. 88/6, Płościnica District, Modernization Of The Existing Sanitary Sewage Network By Reconstruction/Replacement Of The Network Sewage Pumping Station And The Construction Of A Sanitary Sewerage Sewer, As Well As Connecting An Additional Property To The Existing Sanitary Sewage Network - Construction Of A Sanitary Sewerage Sewer.2. In Detail, The Subject Of The Order Includes: 1) Expansion And Reconstruction Of The Sewage Treatment Plant In Płościca - Stage Ii Includes: 1.1) Expansion Of The Administrative And Technical Building With A Service Part, Including Renovation Of The Existing Part Of The Building Along With Internal Water And Sewage + Hot Water Installations (Including White Installation And Water Fittings), Electrical And Instrumentation, Lighting + Emergency, Lightning Protection And Central Heating Installations. Floor With Boiler Room, Control And Safety Group (Propane Air-Water Heat Pump), Integrated Mechanical And Gravity Exhaust Ventilation, Roof Combined With The Replacement Of The Existing Part (Gray Color) And Gutters, Facade (With Insulation) Combined With The Renovation Of The Facade Of The Existing Part, Architrave Including Repairs In The Existing Part, Doors, Windows, Internal Plasters + Painting, Floors + Stoneware, Reconstruction External Water Connections And Installations, External Electrical Installations, Demolition And Reconstruction Works, 1.2) Construction Of A Shelter For A Container For The Discharge Of Dewatered Sludge With Gutters (Up To 25 M2) With Dimensions Approx. 4.1X6x3.5 M, 3 Side Walls Without A Front One And A Self-Unloading Container With A Capacity Of Approx. 400L-600L (For Dewatered Sludge) Mobile (Adapted For Loading Under A Forklift) - 4 Sets, 1.3) Construction Of A Shelter For Technological Blowers And A Unit With Gutters (Up To 25M2) With Dimensions Approx. 3.1X8x3.5 (Up To 25M2), 1.4) Replacement Of The Existing Galvanized Mesh Fence, Approx. 333M Long, Along With Replacing The Wicket And Gate With A Panel Sliding Gate, Approx. 6-7M Long, With An Industrial Drive, Including Power Supply, Electrical Installations And Control, 1.5) Implementation Of Complete Video Monitoring (4 Points) On Existing Poles Along With Electrical And Instrumentation Installations (Details) For Rooms. Control Room, 1.6) Expansion Of Technological Communication Routes With 8 Cm Cubes In The Curb On Both Sides On The Substructure In Accordance With The Load Of The Area. Approx. 200 M2 - Connection Of Transport Connections For Dewatered Sludge From The Place Of Production (Designed Sludge Discharge Shelter) To The Place Of Its Storage (Existing Sludge Storage Shelter), 1.7) Construction Of A Mobile Pax Dosing System (With The Possibility Of Moving Around The Room To Replace The Container) With Integration Into The Existing Treatment System (Location In The Sieve Or Press Room) Along With Electric
|