|
Operation And Maintenance Of Masuti Head Work (Including Man Power And Materials) Under Mulawad Lis- Iii For The Year 2025-26 And 2026-2027-Graduate Holder in Elecrtical Engineer with minimum 5years experence for overall supervision, operation and Maintenance of Masuti Pump house and 220/11KV Substation complete with all lead and lift and as per the directions of engineer Incharge Graduate Holder in Mechanical Engineer with minimum 5years experence for overall supervision, operation and Maintenance of Masuti Pump house and 220/11KV Substation complete with all lead and lift and as per the directions of engineer Incharge Providing Deploma Engineer in Electrical with minimum 5years experience for MLIS Masuti Head Work For the Year 2025-26, 2026-27 complete with all lead and lift and as per the directions of engineer Incharge Providing Deploma Engineer in Mechanicle with minimum 5years experience for MLIS Masuti Head Work For the Year 2025-26, 2026-27 complete with all lead and lift and as per the directions of engineer Incharge Pump Operators/Electrical ITI/ITC/JOC/Wireman for MLIS Masuti Head Work for overall supervision, operation and Maintenance of Masuti Pump house and 220/11KV Substation complete with all lead and lift and as per the directions of engineer Incharge Helper/Heavy Mazdoor for MLIS Masuti Head Work for overall supervision, operation and Maintenance of Masuti Pump house and 220/11KV Substation complete with all lead and lift and as per the directions of engineer Incharge Providing Light Mazdoor for the pump house works in MLIS Masuti Head Work For the Year 2025-26, 2026-27. complete with all lead and lift and as per the directions of engineer Incharge Gardener/Sweeper for MLIS Masuti Head Work for overall supervision, operation and Maintenance of Masuti Pump house and 220/11KV Substation complete with all lead and lift and as per the directions of engineer Incharge Security Guard/Watchman for Security for MLIS Masuti Head Work for overall supervision, operation and Maintenance of Masuti Pump house and 220/11KV Substation complete with all lead and lift and as per the directions of engineer Incharge Transformer Oil as per IS-335:1993 EHV Grade Transformer Oil - New complete with all lead and lift and as per the directions of engineer Incharge Box spanners : 12 nos. per set complete with all lead and lift and as per the directions of engineer Incharge Rubber hand gloves : 15 kV tested complete with all lead and lift and as per the directions of engineer Incharge Rubber shoes knee height complete with all lead and lift and as per the directions of engineer Incharge Rechargeable 5 W LED Hand Torch complete with all lead and lift and as per the directions of engineer Incharge Supplying and installation of RUBBER MAT 1mtr x 1mtr -1Omm thick. complete including cost of materials, labour, usage charges of machinery complete as per specifications. complete with all lead and lift and as per the directions of engineer Incharge Supply and delivery at site best indigenous brand new power capacitor as per IS 2834/1986 with latest amendments with KPTCL authorities and erection, electrification and commissioning of the same at the location of respective pump sets. complete with all lead and lift and as per the directions of engineer Incharge "Testing & Commissioning: C&R Panels Wiring & Testing Testing of C&R panels: Testing for insulation level, testing of relays, control operations for closing tripping etc., interlock. Alarm annunciation & indication checks (with SAS) complete with all lead and lift and as per the directions of engineer Incharge " Filtration of oil using filter set of the contractor to bring the insulation value to I.E. specification complete with all lead and lift and as per the directions of engineer Incharge "Testing & Commissioning of Power Transformers Testing : 1. Ratio Test, 2. SC Test, 3. Excitation Current Test/Highpot Test, 4. Magnetic Balance Test, 5. Vector Group Test, 6. Induced High Voltage Test, 7. OLTC Operation - Local and Remote, 8. Protective Devices Operation Checks, 9. Stability Checks : For Differential & REFR Protection, 10. Winding Resistance Test, 11. Insulation Resistance Test, 12. Tan-Delta and Capacitance Test, 13. Transformer mounted protective Devices, 14. Sweep Frequency Response Analysis complete with all lead and lift and as per the directions of engineer Incharge " "Erection of CTs and PTs Testing & Commissioning of Current Transformer Testing and Commissioning of CT: Insulation resistance, polarity, ratio, excitation, Core identification, tan-delta & capacitance test. (220 kV) complete with all lead and lift and as per the directions of engineer Incharge " "Erection of CTs and PTs Testing & Commissioning of Potential Transformers (Induction Type Voltage Transformer/Capacitance Type Voltage Transformer) Testing and Commissioning of PT: Insulation resistance, polarity, ratio, excitation, Core identification, tan-delta & capacitance test complete with all lead and lift and as per the directions of engineer Incharge " Work of overhauling and servicing and repairing of southern switch gear make breakers of motor as specified below: Lowering the breaker from the panel after isolating the supply, draw out the breaker truck from the panel, checking the fixed and moving contacts. Removing the burnt out parts from the breaker. Supply and fixing of new closing assembly, rose contact, copper poker, banana link, lifting awwembly. Checking the mechanical parts such as moving cam, lifting bar assembly, tripping mechanism and closing mechanism of the breaker and servicing the entire breaker. Check the trip and closing coil of the breaker replace the same if required. Replace the oil (Supply by departmentally). The breaker has to be checked in test position after complete servicing for proper operation and satisfaction. complete with all lead and lift and as per the directions of engineer Incharge Work of repair, overhauling & servicing of southern switch gear breakers of capacitor bank as specified below: Lowering the breaker from the panel after isolating the supply, draw out the breaker truck from the panel, checking the fixed and moving contacts and replace with new contacts wherever necessary. Repair the worn out rose contacts and poker tips. Checking the mechanical parts such as moving cam, lifting bar assembly, tripping mechanism and closing mechanism of the breaker and servicing. Check the trip and closing coil of the breaker. The breaker has to be checked in test position after complete servicing for proper operation and satisfaction complete with all lead and lift and as per the directions of engineer Incharge Work of supply and fixing of isolator panel and capacitor panel fuses to motor. as specified below: A) Removing the damaged burnt out fuses upto 63Amps 7.2 /11 K.V isolator fuses form isolator panel for motor cleaning the fuse carriers with CTC and apply petroleum jelly for fuse contacts and rectify the faulty in the isolator panel. Supply and fixing new fuses upto 7.2/11 K.V isolator fuses to the fuse carrier and checking its working. B) Removing the damaged burnt out fuses upto 30Amps 7.2/11 K.V capacitor fuses form capacitor panel of motor cleaning the fuse carriers with CTC and apply petroleum jelly for fuse contacts and rectify the faulty in the isolator panel. Supply and fixing new fuses upto 7.2/11 K.V capacitor fuse to the fuse carrier and checking its working complete with all lead and lift and as per the directions of engineer Incharge Work of replacement of faulty control components and modification and rewiring of soft starter panel upto 1250KW/6.6KV motor as specified below: a. Disconnecting the power cables and control cables. b. Removal of faulty control components and cable disconnections. c. Supply and fixing Auxiliary contractors, upto 110Volt DC coil Supply with 2 NO, 2NC. d. Supply and fixing of Electronic Timers, 24 Volt AC Range 0 to 30 seconds. e. Supply and fixing of MCBs, 2 pole, 10A.f. Supply and fixing of suitable color LED indication Bulbs and reset Push Buttons Red in color. g. Supply and fixing of temperature Scanner. Along with RTDs 3.5 Mtr Each. h. The necessary tapping/drilling work has to be done for fixing the above components and rewiring to be done etc., i. Testing the soft starter with above supplied components. j. Commissioning the soft starter and handing over the system to complete with all lead and lift and as per the directions of engineer Incharge "Erection of CTs and PTs Erection of CTs and PTs and wiring including movement from the point of unloading to the point of erection (220 kV) complete with all lead and lift and as per the directions of engineer Incharge " "Erection of CTs and PTs Assisting in Testing and Commissioning of Current Transformer (220 kV) complete with all lead and lift and as per the directions of engineer encharge " "Erection of CTs and PTs Testing & Commissioning of Current Transformer Wiring: Inspection of wiring, ferruling, crimping of lugs, connections in CT, marshalling box & control panel, extension of earth mat etc., (220 kV) complete with all lead and lift and as per the directions of engineer encharge " Repair of EOT Crane (80Tonne) complete with all lead and lift and as per the directions of engineer Incharge Erection of Isolator Assembly, erection, alignment and wiring including movement from the point of unloading to the point of erection Upright complete with all lead and lift and as per the directions of engineer Incharge Erection of Isolator Assembly, erection, alignment and wiring including movement from the point of unloading to the point of erection Under hung complete with all lead and lift and as per the directions of engineer Incharge BATTERY SET : Plante/Grid Plate Type 220 V, 300 AH complete with all lead and lift and as per the directions of engineer Incharge "BATTERY CHARGER : 2 x 220 V, 300 AH (with 2 nos. of float and 2 nos. of float cum boost including control panels, change over arrangement etc., complete as per technical specification along with 2 separate DC Distribution Panels (Indoor) 1I/C+20 O/G SFU 60A+20 O/G SFU 30A. complete with all lead and lift and as per the directions of engineer Incharge " "Oil filled Current Transformer 0.2s class with terminal connector suitable for Al. tube/conductor with marshalling box etc., complete as per technical specification. 220 kV Class : 800-600-400-300/1-1-1 A plus 2 cores of 800/1 Acomplete with all lead and lift and as per the directions of engineer Incharge "
|