|
Hospital Facilities Construction Work – Design- Phases: Pt +Cs + Pac+De+At And Execution Of Works, Technological And Functional Equipment For The Project: Rehabilitation, Consolidation, Modernization, Energy Efficiency Building C1, Partial Demolition And Reconstruction C1, Demolition C2, C3 In The Premises Of The Recovery Hospital - Neuropsychomotory Department For Children - Baile 1 Mai. Design - Phases: Pt +Cs + Pac+De+At And Execution Of Works, Technological And Functional Equipment For The Project: Rehabilitation, Consolidation, Modernization, Energy Efficiency Body C1, Partial Demolition And Reconstruction C1, Demolition C2, C3 In The Premises Of The Recovery Hospital - Neuropsychomotory Department For Children - 1 Mai Bathrooms C1 - Interventions On The Existing Building As Well As The Functional Structure, This Includes: * Ground Floor: Reception Area And Reception Office, Guard Room, Medical Offices, Electrotherapy, Physiotherapy, Magnetodiaflux, Hydrotherapy, Paraffin, Salons, Changing Rooms, Playroom, Sanitary Groups, Technical Spaces, Kitchens, Dining Room And Lecture Halls; * Floor 1: Physical Medicine And Balneology Recovery Department - Children; The Existing Kitchen And Dining Room On The Ground Floor Of The Building Will Be Relocated To The Preserved Area Of The C1 Body, It Is Proposed To Partially Demolish The C1 Body In The Area Where The Existing Kitchen Is Located, And In Its Place It Is Proposed To Expand The C1 Body With 48 Rooms. Also, On The Ground Floor, Hidroterapia 2 Will Be Relocated In Place Of The Parafina Room, And This Will Be Relocated In Place Of The Playground On The Ground Floor. All Treatment Rooms (Kinesitherapy, Electrotherapy, Magnetodiaflux) Will Be Located In The North-West Wing Of The Existing Building, So Only Medical Offices Will Operate In The South-West Area. All Medical Offices And Salons Will Have Their Own Sanitary Facilities/Bathrooms, And The Common Sanitary Facility On The First Floor Will Be Abolished And A Playground Will Be Established In Its Place. In The Entire Building, The Finishes Will Be Redone In Warm And Soothing Colors. It Is Planned To Finish The Floors With Pvc In The Entire Body Of The Hospital And To Finish The Walls With Pvc Wallpaper. The Existing Beds In The Salons (With Mechanical Actuation) Will Be Replaced With Others, With Increased Comfort And Electric Operation, Of The Latest Generation. Also To Increase The Level Of Comfort, Ambient Plants And Artistic Decorative Elements On The Walls (Photos, Paintings, Etc.) Will Be Provided Inside. In Order To Ensure Relaxation And Recreation Spaces For Staff And Patients, On The Ground Floor Outside, The Interior Courtyards Will Be Arranged So As To Meet These Needs. The Building Will Be Equipped With Fire Safety Installations To Meet Current Standards. The Proposed Extension Will Be Equipped With An Elevator For Transporting Patients On Stretchers, And It Will Be Provided With Sound Signaling And Braille Markings For The Visually Impaired And Visual Signaling For The Hearing Impaired. In Order To Increase The Energy Efficiency Of The Building And Implicitly Decrease Operating Costs: - All Lighting Fixtures Will Be Replaced With Energy Efficient Ones; - Photovoltaic Panels Will Be Provided On The Envelope Of The Proposed Extension; - The Proposed Extension Will Be Thermally Wrapped With 20 Cm Basalt Wool And A Ventilated Facade System With
|