1. The Subject Of The Order Are Construction Works. Mon. Construction Of A Columbarium And Area Lighting At The Municipal Cemetery At Ul. Rabina Dr.Maxa Josepha 4 In Słupsk Including The Construction Of A Columbarium And An Access Road With A Parking Lot. Along With Companion Infrastructure. 2. As Part Of The Order. The Following Will Be Constructed: 1) Columbarium: The Investment Includes The Construction Of A Columbarium (With Prefabricated Elements), Which Will Be A Place Of Commemoration And Burial Of The Cremated Bodies Of The Deceased. It Comes In The Form Of Single- And Double-Sided Reinforced Walls. From Ready-Made Prefabricated Plants. With Ready-Made Niches For Urns Placed On A Foundation Armed With Load-Bearing Columns Stabilizing The Entire Structure. 2) Small Architecture: A) Benches, B) Cast Iron Street Fountain, C) Wooden Cross. 3) Communication Routes: A) The Cubes Have Strongly Rounded Corners And Edges, Smooth Surfaces. Facing And Narrow Joint Closure. B) Walking Paths - Access Road To The Columbarium. C) Hardening Near The Columbarium. 4) Parking Lot - Above. Made Of Concrete Blocks.5) Lighting: A) In The South-Eastern Part: Types Of Fixtures And Poles Are Given In Drawing No. A1a/01G And Parking Lighting. B) In The North-Eastern Part: - Types Of Fittings And Poles Are Given In Drawing No. A1a/01G And A2b/01.6) Fence: A) Made Of Black Steel Spans, Forged On A Stone Foundation, Gate And Wicket In The Same Style, B) Prefabricated Fences. Element. Reinforced Concrete.7) Rainwater Drainage System: A) Solid Pvc Sn8 Pipes, B) Street Rain Inlets. Dn500 Concrete. With Settling Tanks, C) Plastic Wells. Dn400 With Settling Tanks, D) Concrete Wells, E) Reinforced Retention Tank. Rainwater,F) High-Efficiency Lamella Separator.8) Water Installation. –Water Pipes. Pressure. Pe63 Connected By Butt Welding Or With Electrofusion Couplers.9) Greenery - Clearing Of Greenery To The Necessary Extent And Planting Of High/Low Greenery Together With The Care Of Greenery, Cleaning Works, Purchasing Wood From Felling Trees. Detailed Scope In The Swz, Including The Draft Contract.3. Subject Of The Order Was Described In Accordance With Article 103 Of The Public Procurement Law Using Documents Design, Bill Of Quantities And Stwior. Pursuant To Article 101(4) Of The Public Procurement Law, The Ordering Party Allows Solutions Equivalent To Those Described In The Document. Project, Stwior Using Standards, European Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems. -Article 101(1)(2) And (3) Of The Public Procurement Law.4. In Case Of Discrepancies Between Stwior And The Document Project, The Parent Document Is Document. Project.5. Wherever Specific Standards And Regulations Are Referred To In The Procurement Documents That Materials, Equipment And Other Goods As Well As Performed And Tested Works Are To Meet, The Provisions Of The Latest Edition Or Revised Edition Of The Cited Standards And Regulations Will Apply. If
Contact Information
Address
Zarząd Infrastruktury Miejskiej W Słupsku,Słupsk,76-200,Pomorskie,Pl636 - Słupski
Contact No.
+48598410091
Email
zamowienia@zimslupsk.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106852289
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.