|
Supply And Placement Of Work Sign In Galvanized Sheet, Junior Construction Civil Engineer With Additional Charges, General Works Supervisor With Additional Charges, Manual Soil Turning And Cleaning, Conventional Work Location, Using Pontaleta Running Board Template, 12/29/2025 - 10:45:30, Manual Trench Excavation With Depth Less Than Or Equal To 1.30 M, Cyclopean Concrete 30% Made From Mao Stone Minimum Cement Consumption 150 Kg/M3, Unidirectional Precast Slab, Bi-Supported, For Floor Filling In Ceramic, Vig, Fence Masonry With Perforated Ceramic Brick, Esp. 9 Cm, For Cladding,, Masonry Sealing With Perforated Ceramic Brick Width 9 Cm, Fencing Masonry With Perforated Ceramic Brick Thickness 9 Cm, Wall Plaster, With Cement And Sand Mortar, Thickness 0.5 Cm Trace 1:3, Single Mass, For Receiving Paint, In Mortar Trace 1:2:8( Cement, Lime, Ceramic Coating For Internal Walls (H=1, 50 M) With Enamelled Plates, Supply And Installation Of Complete Structured Door, Hinge And Frame, Mortise Lock For Bathroom Door, Complete, Popular Standard Finish, Tilting Steel Window, Fixing With Mortar, Without Glass, Standardized (60X60cm, Smooth Glass Common Transparent Sp. 3 Mm Laid, Thin Concrete For Ballast, Mix 1:4, 5:4, 5 (Cement/Medium Sand/Crushed Stone 1), Ceramic Floor Covering With Gres Type Slabs, Dimensions 35 Pva Latex On Walls - Two Coats., Painting Frames In Synthetic Enamel - Two Coats, Including One Coat Of, Embed Point For One (1) Simple Switch (10A-250V), Insulated Flexible Copper Cable, 2.5 Mm², Flame Retardant 450/750 V, For Circuits, Compact Led Lamp 10 W, E27 Base, Supply And Installation Of Washbasin In White Crockery, Suspended, Including Siphon, Siphon Toilet With Attached Box White Crockery - Supply And, Double Washing Tank In Synthetic Marble With, Supply And Installation Of Pvc Foam Box, 250X230x75 Mm, Tube, Supply And Installation Of Sink Synthetic Marble Kitchen (1, 20 Simple Plastic, Inspection/Passage Sewer Box In Masonry (50X50x45 Cm) Lining, Supply And Installation Of Pvc Pipe, Normal Series, Building Sewer, Dn 40Mm, Hydro-Sanitary Installation Of The Module - According To The Attached Composition, Manual Excavation Of Trenches 1, 50 M≪ 3.00 M, Ribbed Welded Steel Mesh Reinforcement Q-138, Ca-60 Steel, 4.2Mm, Mesh 15X15cm, Floor (Background) In Concrete Fck 15 Mpa, Trace 1:3, 4:3, 5, With Cement Mortar And Sand, Thickness 0.5Cm, Trace 1:3, Mass Single, In 1:2:8 Mortar, Preparation, Pvc Pipe, Building Sewer Dn 100Mm, Supplied And Installed, Supply And Installation Of 100Mm Pvc Sewer Tee, Prefabricated Concrete Containment Plate, Measures 1, 00X0, 60X0, 05 M, Covers On Plates Precast Reinforced Concrete Fck -15 Mpa Sp. 7 Cm., 50M ≪ Supercine Com
|