|
Rental, Installation And Uninstallation Of A 14,980Lm Led Projector Load 11.7 Tm, Maximum Horizontal Reach 9. 70M, Including Tocopbt Truck 16,000 Kg, Power 189 Hp - Chp Diurno.Af06/2014, Installation And Uninstallation Of Emnoril Three-Phase Metering Board With Reading Lens, 12/26/2025 - 16:38:26, 26/12/2025 - 16:38:29, Installation And Uninstallation Of Din Type Circuit Breaker, Tripolar63a, 5 Ka, Curve C, Installation And Uninstallation Of Circular Concrete Post 10/200, Installation And Uninstallation Of Double Concrete Post (Dt) 12/600, Installation And Uninstallation Of Duplot Concrete Post (Dt) 9/300, Installation And Uninstallation Of Installation Iron Post4 Plate 3.0A, Connection To Light Point And Sockets At Operational Stations - Rental Of Supplies With Installation And Uninstallation, Installation And Uninstallation Of Led Projector From 14,980 Lm To 20,020 Lm, Installation And Uninstallation Of Multiplexed Cable For Network 3X1x1616mm2, Installation And Uninstallation Of Rental Of A 37,000Lm Led Projector, Electrician With Additional Charges, Installation And Uninstallation Of Three-Phase Measuring Board In Noril With Reading Lens, Electrician Assistant With Additional Charges, Installation And Uninstallation Of Grounding Composed Of Copper Rod Ø 5/8 X 2, 40M, Interconnected With 35Mm2 Copper Cable, Light Point Connection And Sockets At Operational Stations - Rental Of Supplies With Installation And Uninstallation, Installation And Uninstallation Of Led Projector 14,980Lm Up To 20,020Lm, Installation And Uninstallation Of Multiplexed Cable For Network 3X1x1616mm2, Supply, Installation, Maintenance Removal Of 5/16 Covered Steel Cable, Installation And Uninstallation Of Din/Iec Type Circuit Breaker, Three Pole 6, Installation And Uninstallation Of Concrete Circular Post 10/200, Installation And Uninstallation Of Grounding Composed Of 3 Copper Rods Ø 5/8 Reading, Tripolar 63A, 10Ka
|