|
Work 1- General Mechanized Cleaning, Including Removal Of Vegetation Cover - Trunks With A Diameter Of Up To 10Cm - Without Transport, Work 1- Mechanized Loading And Removal Of Rubble, Including Transport Up To 1Km, Work 1- Removal Of Rubble With A Metal Bucket, Including Manual Loading And Unloading In Bota-Fora, Work 1- Transport Of Debris By Dump Truck, From 1Km, Work 1- Cutting, Clipping And Removal Of Trees Including Diameter Roots. ≫ 30 E ≪ 60Cm, Job 1- Cutting And Spreading Inside The Job, Job 1- Cutting And Loading For Boot-Out, Job 1- Supply Of Earth, Including Cutting, Loading, Unloading And Transportation Up To 1Km, Job 1- Landfill, Including Compaction, Job 1- Transport Of Earth By Dump Truck, Job 1- Manual Excavation, Equal Depth Or Less Than 1.50M, Job 1- Concrete Ballast, 150Kg Cim/M3, Job 1- Perforated Pvc Pipe For Drainage - Diameter 4 (100Mm), Job 1- Metallic Siding With Metallic Tile, Unpainted, Trapezoidal 40 Sp=0.43Mm, Columns, Bases And Screws, Job 1- Screen For Protection Of Works, Mesh 2 Mm, Work 1- Work Location, Work 1- Concrete Drill - Diameter 25Cm, Work 1- Continuous Helix Excavated Piles - Diameter 50Cm, Work 1- Piping Of The Bottom Of Trenches, For Simple Regularization, With Vibrating Socket, Work 1- Crushed Ballast, Project 1- Basement Masonry - Common Solid Bricks, Project 1- Waterproofing Of The Foundation Backing - Waterproof Mortar, Project 1- Backfilling Of Trenches, Including Piping, Project 1- Common Form Of Pine Boards - Flat, Project 1- Ca-50 Steel Reinforcement, Project 1- Concrete Fck=25Mpa - Machined, Job 1- Cardboard Tube Form, Diameter 350Mm, Job 1- Ca-60 Steel Reinforcement - Screen, Job 1- Concrete Fck = 25.0Mpa - Machined, Job 1- Concrete Fck = 30, Job 1- Concrete Pumping, Job 1- Lattice Mixed Slab H-8Cm With Capping 4Cm (12Cm), Job 1- Cleaning Of Surfaces With Hydro-Blasting, Job 1- Mechanical Sanding On Concrete Surfaces, Job 1- Preparation And Application Of Stucco, Job 1- Concrete Polishing, Job 1- Supply And Assembly Of Vertical Metallic Structure - Non-Skidable, Job 1- Supply And Assembly Of Metallic Structure Vertical - Skatable, Job 1- Steel Structure For Stairs, Walkways And Marquises, Including Assembly, Job 1- Precast Concrete Structure - Supply And Assembly, Job 1- Vb.01 - Masonry In Concrete Blocks 19 Concrete Grout, Job 1- Concrete Lintels, Straps And Bollards, Job 1- Neocon Standard Sanitary Partition Or Similar, Job 1- Carpet Type Textile Acoustic Absorber, Job 1- Hollow Concrete Element - Type Neo-Rex N.16 Or Similar, Job 1- Demolition Of Masonry In General (Bricks Or Blocks), Job 1- Mechanical Protection With Cement And Sand Mortar - Mixture 1:7, Average Thickness 30Mm, Job 1- Waterproofing Mortar With Cement, Sand And Water-Repellent, Job 1- Asphalt Blanket 4Mm Thick With Polyester Veil Glued Using A Torch, Job 1- Bd.12 - Waterproofing Based On Asphalt Emulsion - Structured With Polyester Fabric - 2 Layers Of Structuring, Job 1- Waterproofing With Asphalt Membrane - With 3 Layers Of Asphalt Felt 15Lbs, Job 1- Elastic Mastic Based On Polyurethane - Single-Component, Job 1- Supply Of Metallic Structure For Roofing, Job 1- Assembly Of Metallic Structure For Roofing, Job 1- Tile Double Trapezoidal In Galvanized Steel - E= 0.8Mm, Coating B, H=40Mm - Paint
|