|
The Subject Of The Order Is To Carry Out All Works And Construction Works Related To The Reconstruction Of The Building Of The Świętokrzyskie Cardiology Center Of The Provincial Hospital In Kielce, Consisting In The Modernization Of The Mechanical Ventilation Installation Along With Its Acoustic Development At The Level Of The Fourth Floor Terrace, In Accordance With The Task Documentation, I.E.: Design Documentation, Stwior, And Bills Of Quantities Constituting Annexes No. 2A, 2B, 2C To Swz, In Particular Carrying Out Works In The Scope Of: A) Construction Works Consisting Of: - Making Covers On The Eastern And Western Terraces With Pvc Meshes Against Birds, - Renewing The Paint Coatings In The Rooms, - Widening The Exit Doors To The Roof, - Thorough Renovation Of The Terraces, - Securing The Attic Around The Building With A Concrete Slab With Additional Galvanized Sheet Metal Flashing, - Enclosing The Terrace On The South Side With Blinds, B) Installation Works Consisting In On: - Construction Of A Ventilation Installation, Including Replacement Of Ventilation And Air-Conditioning Units, Together With Control Automation Adapted And Connected To The Existing Visualization System And With The Possibility Of Later Connection To The Bms System, - Construction Of A Freon Installation, - Construction Of A Chilled Water Installation, - Construction Of A Glycol Recovery Installation, - Construction Of A Humidification Installation, - Construction Of A Water And Sewage Installation Supplying Steam Humidifiers And Ensuring The Drainage Of Condensate And Condensate From The Installation Ventilation, - Carrying Out All Necessary Dismantling Works, Including Transport And Disposal, - Carrying Out Correction Works After The Works Carried Out And Restoring Them To Their Original Condition, - Carrying Out Security Measures Necessary For The Continuous Operation Of The Hospital Facility And Temporary Installation Connections To Guarantee Uninterrupted Operation Of All Installations, - Carrying Out Appropriate Tests Of The Efficiency Of The Ventilation Installation, Tightness Tests And Noise Measurements, - Carrying Out Essential And Accompanying Works In Accordance With The Design Documentation, C) Electrical And Installation Works Low-Current Systems Consisting Of: - Construction Of An Electrical Switchboard Supplying Power To The Ventilation Units, - Installation Of A New Wlz Power Supply From The Main Switchboard Of The Building (Basement) To The Ventilation Switchboard Installation Room, - Installation Of Power Supply For The Ventilation Units From The New Ventilation Switchboard, - Installation Of Lan Installations Connecting The Control Systems Of The Air Handling Unit With The Local Gpd Cabinet, - Installation Of Potential Equalization Within The Switchgear Room And The Structure Of The Ventilation Units, - Installation Of Lighting In The Electrical Switchboard Room And In The Installation Site Ventilation Units, - Adapting The Existing Fire Alarm Instal
|