|
The Subject Of The Order Is The Construction Of A Public Utility Building Adapted For Disabled People - A Village Community Center In The Village Of Godzieszówek In The Strzegom Commune, Together With The Necessary Infrastructure, Land Development And Equipment On Plots With Registration Numbers 1096 And 1128, District 021906_5.0004, Godzieszówek. As Part Of The Order, It Is Planned To Build A Community Center - A Single-Story Building With A Usable Area. 125.40 M2 With A Terrace (Acting As A Shelter) With An Internal Road, Parking Spaces, Small Architecture, Connections, Planting Of Greenery, A Fence, An Exit. The Scope Of Works Includes: - Earthworks, - Construction Of Foundations, - Bricklaying Of Walls, - Roofing Works, - Moisture And Waterproofing Insulation Works, - Plastering Works, - Works Facade Works, - Plastering Works, - Duct Casing, - Ahu Cover, - Execution Of Wall And Floor Cladding, - Finishing Works, - Assembly Works, - Construction Of A Water Supply Connection, - Construction Of A Sanitary Sewage Connection, - Construction Of An Air Conditioning Installation, Installation Of Anti-Vibration Mats For External Units Of Air Conditioners, - Construction Of A Mechanical Ventilation Installation, - Construction Of An Installation Exhaust Ventilation, - Installation Of Cold And Hot Water, - Delivery And Installation Of Electric Flow Heaters, - Installation Of Sanitary Sewage, - Installation Of Central Heating, - Installation Of A Grease Separator, - Installation Of An External Fire Hydrant, - Purchase And Installation Of Rainwater Tanks 650 L - 6 Pcs., - Installation Of A Dry Stream, - Installation Of Underfloor, Electric Heating Using Heating Foils, - Implementation Of A Photovoltaic Installation, At The Entrance To The Building Install A Sign Informing About The Photovoltaic Installation In Accordance With The Design Documentation, - Implementation Of The Buildings Electricity Supply, - Installation Of The Main Fire Protection Switch, - Implementation Of An Electrical Switchboard, - Implementation Of A Wireless Telecommunications Installation, - Implementation Of A Power Installation, - Implementation Of A Power Supply Installation For Socket Circuits, - Implementation Of An Electric Shock Protection Installation, - Implementation Of Lighting Area, - Implementation Of Internal And External Lighting Installations, - Implementation Of Grounding And Lightning Protection Installations, - Implementation Of Lighting Installations, - Attention!! Construction Of A Power Supply System For Chargers Enabling Their Subsequent Installation, Including Wires, Cables, Channels Ending With A Well, Intended For Charging Points. The Scope Of The Order Does Not Include The Purchase And Installation Of Chargers, - Installation Of A Sliding Gate Drive, - Installation Of Equipotential Bonding, - Installation Of External Cctv Monitoring, - Purchase And Installation Of Passive Energy Compensation Devices, - Delivery And Installation Of An Air Curtain, - Delive
|