4.1. Construction Of A Municipal Road Without A Number - Ul. Father Stanisław Matraś From Km 0+000.00 To Km 0+308.53 In Biłgoraj. The Subject Of The Investment Is The Construction Of A Municipal Road Located In The Różnówka Housing Estate In Biłgoraj. The Task Also Includes The Construction Of A Section Of Storm Sewage System With Connection To The Existing Sewer, Led Street Lighting, Construction Of A Section Of The Water Supply Network, A Section Of The Sanitary Sewage System And The Removal Of Electrical And Telecommunications Conflicts. 1). Road Industry Works) Demolition Works (Surfaces, Street Elements) And Preparatory Works (Measurements, Cutting Down Trees), B) Earthworks, C) Construction Of A Road With A Surface Made Of Multi-Dimensional Concrete Paving Stones In The Bruk Style, Gr. 8 Cm, Color: Melange Gray And Graphite, Without A Bevel (Micro-Bevel Allowed), With A Basic Width Of 5.5 M, D) Construction Of A Pedestrian Road And Access To The Gates Made Of Multi-Dimensional Concrete Paving Stones In The Bruk Style, Thickness. 6 Cm, Light Brown/Red Melange Color, Without Bevel (Micro-Bevel Allowed),E) Construction Of Entrances To The Property Using Concrete Paving Stones Of The Bruk Type, Thickness. 8 Cm, Graphite Color, Without Phase (Micro-Phase Allowed), F) Adjustment Of The Height Of Underground Facilities, G) Finishing Works, H) Introduction Of Permanent Traffic Organization, I) Other Accompanying Works, J) Construction Of A Road Culvert At The Intersection With Ul. Nowakowski.2). Sanitary Industry Works) Construction Of A Section Of Storm Sewage System With Connection To The Existing Canal, B) Construction Of Kd Sewers With Street Inlets On The Existing And Planned Sections, C) Construction Of A Section Of Sanitary Sewage System With Sewer Lines, D) Reconstruction And Construction Of A Section Of The Water Supply Network3). Works In The Electrical Industrya) Construction Of Street Lighting With A Cable Line - Led Luminaires Equipped With A Controller Or Power Supply System Enabling Programming Of A Five-Stage Reduction Of Luminous Flux And Power In Accordance With The Schedule Agreed With The Ordering Party, Zhaga-D4i Connector Installed From The Bottom Of The Luminaire (Do Not Use The Nema Connector), Additionally The Devices Must Be Equipped With A Sensor For Measuring The External Light Intensity, B) Construction Of Dedicated Lighting For Pedestrian Crossings, C) Network Protection Power Engineering. Assumed Technical And Operational Parameters: A) Single-Lane, Two-Lane, Two-Way Road, B) Road Category - Municipal, C) Semi-Street Cross-Section, Note: When Pricing, The Contractor Will Take Into Account The Completion Of The D400 Sanitary Sewage System Wells According To Drawing S-7A (Applies To Both The Construction Of The Sanitary Sewage System And The Reconstruction Of The Existing Network). The Thickness Of The Construction Layers For The Valuation Should Be Based On Drawing No. 4 Technical Design Of The Road Industry And Bill O
|