|
1. Scope Of Works And Other Conditions Regarding The Contract1) Description Of The Design Part, Including: A) Preparation Of A Construction Design, B) Carrying Out The Procedure For Compliance Of The Construction Design - Design Documentation With The Directive On The Assessment Of The Effects Of Certain Public And Private Projects On The Natural Environment (As Amended), C) Obtaining A Positive Opinion Of The Intermediate Body On This Matter Before Commencing Construction Works In Accordance With The Provisions Of The Co-Financing Agreement, D) Obtaining A Zrid Decision And Any Other Decisions And Arrangements Required By Law Regarding Individual Sectors Of The Project (Including Conservation Permit, Arrangements Of Tauron S.A., Etc. Arrangements Of The Network Administrators), E) Preparation Of A Construction Design In Accordance With The Applicable Provisions Of The Construction Law, F) Preparation Of Technical Specifications For The Execution And Acceptance Of Works, G) Preparation Of Bills Of Quantities And Cost Estimates For Each Industry Separately, H) Preparation Of Information Regarding Safety And Health Protection, I) Participation In Meetings Organized By The Ordering Party, During Which The Contractor Will Present The Proposed Solutions Design, J) Taking Into Account The Recommendations And Guidelines Presented By The Investors Supervision Inspector When Designing. The Development Of Design Documentation Must Be Based On The Functional And Utility Program And The Feasibility Study.2. The Scope Of Basic Works (Characteristic Data) Is: Reconstruction And Expansion Of Road Infrastructure In The Streets: Bohaterów Warszawy, Mariacka, Partyzonów, Norwida As A Result Of Floods, And In Particular: - Reconstruction And Expansion Of Municipal Roads, - Reconstruction And Expansion Of Sidewalks, - Reconstruction And Expansion Of Exits, - Reconstruction And Construction Of Parking Spaces For Cars, - Reconstruction Of Windows. Basements Located At The Level Of The Sidewalk Surface, - Arrangement Of Green Areas, Including The Introduction Of New Plantings, - Construction Of A Rainwater Drainage System In The Place Of The Combined Sewage System, For The Purposes Of Separating Sanitary Sewage And Rainwater, - Reconstruction And Construction Of Road Lighting Lines, Including Lighting Dedicated To - Pedestrian Crossings, After Dismantling Part Of The Road Lighting Owned By Tauron Nowe Technologie, - Reconstruction Of Power Lines And Devices Colliding With Planned Development Of Municipal Roads, - Reconstruction Of Telecommunications Lines And Devices, Colliding With The Planned Development Of Municipal Roads, - Reconstruction Of The Gas Network And Gas Connections, Colliding With The Planned Development Of Municipal Roads, - Reconstruction Of The Water And Sewage Network, Colliding With The Development Of Municipal Roads, - Implementation Of Road Markings And Traffic Safety Devices. The Total Length Of Municipal Roads Planned For Reconstruction And Exp
|