1. The Subject Of The Task Is The Construction And Modernization Of The Water Supply Network In The Towns Of Raszków And Suszyna.1.1. The Scope Of The Task Is To Modernize The Existing Water Supply Network By Building A New Water Supply Network Along With The Modernization And Construction Of New Side Sections To All Buildings And Plots Intended For Development In The Villages Of Raszków And Suszyna, In Accordance With The Provisions Of The Local Development Plan, In The Design-Build Formula.1.2. The Planned Project Is A Public Purpose Investment, Has A Linear Character And Includes The Construction Of A Pressure Water Supply Network Dn160, Dn125, Dn110, Dn90 Mm Along With Side Sections Of Dn 40 Mm Made Of Pehd Pipes To The Boundaries Of Building Plots.1.3. As Part Of The Task, It Is Also Planned To Install An Above-Ground Clean Water Tank Vcz = 30 M3 On The Foundation Slab Along With Automation, Accompanying Elements And Laying A Power Cable To The Power Supply Cabinet And With The Development Of The Area Around The Tank, As Well As Installation Of A 3.0X2.5 M Container Hydrophore Set With A Hydrophore Set On The Foundation Slab Along With Automation, With Accompanying Elements And Laying A Power Cable To The Power Supply Cabinet And With Development Of The Area Around It. Hydrophorni1.4. A Detailed Description Of The Parameters Of The Water Supply Network And The Infrastructure Covered By The Task Can Be Found In The Attached Pfu (Descriptive Part). An Integral Part Of The Pfu Is Also A List Of Plots And Information About The Approximate Planned Route Of The Water Supply Network. The Investment Will Be Implemented Only In The Area Of Raszków And Suszyna. The Final Part Of The Fup Contains A List Of Plots Covered By The Order And A List Of Side Sections Covered By The Order.1.5. The Contract In Question Was Envisaged In The Design And Build Mode, Preparation Of Complete Design Documentation Along With The Necessary Arrangements, Decisions And Permits Enabling The Implementation Of The Investment As Well As The Execution And Handover Of The Works To The Investor. The Scope Of The Subject Also Includes Acceptance Activities Of The Contractor And Post-Construction Inventory Of Pipelines And Facilities, As Well As Preparation Of The Necessary Documentation For The Investor To Obtain An Occupancy Permit. The Form Of The Design Documentation Should Be Agreed With The Ordering Party. Due To The Limited Deadline For The Investment, The Ordering Party Commissioned The Development Of A Map For Design Purposes At Its Own Expense. The Map Will Be Provided To The Contractor Free Of Charge. 2. The Contractor Is Obliged To Perform Authors Supervision During The Implementation Of Construction Works. The Contractor Is Obliged To Complete The Task In Accordance With The Design And Technical Documentation Developed By The Contractor And Approved By The Ordering Party And The Relevant State Administration Bodies. The Contractor Will Carry Out The Task Based On Ap
Contact Information
Address
Gmina Radków,Radków,57-420,Dolnośląskie,Pl517 - Wałbrzyski
Email
zamow_publ@radkowklodzki.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106672995
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.