|
General Scope Of Works: 1) Construction Of An Information Board On Both Facilities, Which Will Concern Co-Financing Of The Task From The Funds Of The European Funds For Silesia 2021-2027 Program (Just Transition Fund), In Accordance With The Principles Described In The Manual For Applicants And Beneficiaries Of European Funds For 2021-2027 In The Field Of Information And Promotion And The Guide For Fe Beneficiaries Sl 2021 – 2027”; Boards With Dimensions Of 2.4 M X 1.2 M, 2) Construction Of An Information Board On Both Facilities, Which Will Concern Co-Financing Of The Task From The State Budget, In Accordance With The Provisions Of The Regulation Of The Council Of Ministers Of May 7, 2021 On Determining Information Activities Undertaken By Entities Implementing Tasks Financed Or Co-Financed From The State Budget Or State Earmarked Funds; Boards With Dimensions Of 1.8 M X 1.2 M - Link To The Website: Https://Www.Gov.Pl/Web/Premier/Dzialania-Informacyjne 3) Disassembly Of Coal-Fired Boilers With All Accessories, Equipment, Wiring And Piping, 4) Removal Of Scrap, Rubble And Hazardous Materials From Dismantling And Their Disposal, 5) Delivery And Installation Of Air-Water Heat Pumps With All Accessories, Equipment, Wiring And Piping,6) Installation Of Heating Circuits,7) Installation Of A Refill System,8) Modernization Of The Central Heating Installation - Disassembly Of Steel Radiators, Installation Of Compact Steel Panel Radiators, Installation Of Thermostatic Valves, Vent Valves, Pipelines,9) Carrying Out Tightness Tests - Pressure Water Test, Hot Test, Flushing Of The Installation,10) Execution Of Accompanying Construction Works In The Boiler Room - Plastering, Floors, Stoneware Tiles, Electrical Installation,11) Installation Of Photovoltaic Panels (Modules) In The Popielów Volunteer Fire Department - On The Roof, In The Boguszowice Volunteer Fire Department - In The Area Adjacent To The Fire Station12) Installation Of Inverters Adapted To Power Energy Storage Facilities13) Installation Of The Constant Voltage Dc Side Of The Photovoltaic System,14) Cabling Of The Ac Side Of The Photovoltaic System With Cables To The Point Of Connection To The Grid Power Engineering, 15) Filling In Any Gaps In Walls, Ceilings And Roofs And Sealing The Roof Covering After Passing The Wires, 16) Programming And Configuration Of Photovoltaic Micro-Installation Devices, 17) Checking The Correct Operation Of The Installation, The Implementation Of The Task Should Include Obtaining All Necessary Arrangements/Permits, Including Those With The Fire Department And Tauron Dystrybucja S.A. So That The Facilities In Which The Micro-Installations Will Be Built Can Be Used In Accordance With The Law. The Ordering Party Below Specifies The Activities Related To The Execution Of The Order By Persons Employed By The Contractor Or Subcontractor Under An Employment Contract, In The Circumstances Referred To In Art. 95 Of The Act: 1) Performance Of Installation Works In The Field Of
|