Work Plate Made Of Galvanized Steel Sheet, Polyethylene Water Tank, 500 Liters - Supply And Installation. Af_06/2021, Chapisco Applied To Masonry (With The Presence Of Gaps) And Concrete Facade Structures, Using A Trowel. Mortar Mix 1:3 Prepared In A 400L Concrete Mixer. Af_10/2022, Plaster Or Single Putty In 1:2:8 Mortar Mix, Mechanical Preparation With 400 L Concrete Mixer, Manually Applied To Facade Panels With Gaps, 25 Mm Thick, Access Via Scaffolding. Af_08/2022, Fence Masonry Made Of Vertically Drilled Ceramic Blocks Of 11.5X19x29 Cm (Thickness 11.5 Cm) And Laying Mortar Prepared In A Concrete Mixer. Af_12/2021, 23/12/2025 - 12:30:49, 23/12/2025 - 12:30:51, 23/12/2025 - 12:30:52, Opening Aluminum Venetian Door With Trim, Fastening With Screws - Supply And Installation. Af_12/2019, Roofing With Structural Fibercement Tile E= 8 Mm, With Up To 2 Roofs, Including Lifting. Af_07/2019_Ps, Equipped Rafter *6 Af_07/2019, External/Internal Flashing In Galvanized Steel Sheet Number 26, 33 Cm Cut, Including Lifting. Af_07/2019, Employee With Additional Charges, Manual Application Of Acrylic Sealer Base On External Walls Of Houses. Af_03/2024, Economical Acrylic Latex Paint, Manual Application On Walls, Two Coats. Af_04/2023, Peripheral Pump 1/2Hp, Manual Trench Excavation. Af_09/2024, Pvc Pipe, Weldable, 25 Mm, Cold Water (Nbr-5648), Pvc Knee, 90 Degrees, 25 Mm, Brown Color, For Building Cold Water, Weldable Pvc Sleeve, Pressure Register, Pvc, Weldable, Single Handwheel, Dn 25 Mm - Supply And Installation. Af_08/2021, Plumber Or Hydraulic Firefighter With Additional Charges, Plumbers Assistant Or Hydraulic Firefighter With Additional Charges, 20Mm Pipe, Installed In Water Branch Or Sub-Branch - Supply And Installation. Af_06/2022, Reduction Sleeve, Dn 50Mm X 25Mm, Installed In Plumbing Water Supply And Installation. Af_06/2022, Sleeve, Dn 25Mm, Installed In Water Plumbing - Supply And Installation. Af_06/2022, Adapter With Flange And Sealing Ring, Dn 50 Mm X 1 1/2, Installed In Building Water Reservoir - Supply And Installation. Af_04/2024, Roscável, 3/4 - Supply And Installation. Af_08/2021, Manual Excavation For Crowning Block Or Footing (Including Excavation For Placing Formwork). Af_01/2024, Gres Stone 42X21x15cm, Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Concreting Of Crowning Block Or Baldrame Beam, Fck 30 Mpa, Using Jerica - Laying, Thickening And Finishing. Af_01/2024, Manufacture, Assembly And Disassembly Of Formwork For Baldrame Beam, In Sawn Wood, E=25 Mm, 4 Uses. Af_01/2024, Manufacture Of Formwork For Pillars And Similar Structures, E=25 Mm. Af_09/2020, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 8.0 Mm Ca-50 Steel - Assembly. Af_06/2022, Frame Of Pillar Or Beam Of Reinforced Concrete Structure Embedded In Fence Masonry Using Steel Ca-60 Of 5, Concreting Of Pillars, Fck = 25 Mpa, Using Buckets - Launching, Densification And Finishing. Af_02/2022, Concreting Of Beams And Slabs, Fck=25 Mpa, For Any Type Of Slab With Buckets In Building
|