|
Work 1- General Mechanized Cleaning, Including Removal Of Vegetation Cover - Trunks With A Diameter Of Up To 10Cm - Without Transport, Work 1- Mechanized Loading And Removal Of Rubble, Including Transport Up To 1Km, Work 1- Removal Of Rubble With A Metal Bucket, Including Manual Loading And Unloading In Bota-Fora, Work 1- Transport Of Debris By Dump Truck, From 1Km, Work 1- Cutting, Clipping And Removal Of Trees Including Diameter Roots. ≫ 30 E ≪ 60Cm, 23/12/2025 - 14:47:05, Job 1- Cutting And Spreading Inside The Site, Job 1- Cutting And Loading For Disposal, Job 1- Landfill, Including Compaction, Job 1- Transport Of Earth By Dump Truck, Job 1- Manual Excavation, Depth Equal To Or Less Than 1, Job 1- Manual Excavation, Depth Equal To Or Less Than 1, Of Work - 5M, Pivoting, 2 Sheets, For Siding, Work 1- Work Protection Screen, 2 Mm Mesh, Work 1- Concrete Drill - 25Cm Diameter, Work 1- Continuous Helix Excavated Pile - Diameter 50Cm, Work 1- Manual Excavation With Depth Equal To Or Less Than 1, Work 1- Piping Of The Bottom Of Trenches, With Vibrating Socket, Job 1- Crushed Ballast, Job 1- Concrete Ballast - 150Kg Cim/M3, Job 1- Basement Masonry - Common Solid Bricks, Job 1- Waterproofing Of The Back Of The Foundation - Waterproof Mortar, Job 1- Backfilling Of Trenches, Including Piping, Job 1- Common Form Of Pine Boards - Non-Recoverable, Job 1- Ca-50 Steel Reinforcement, Job 1- Concrete Fck=25Mpa - Machined, Job 1- Cardboard Tube Shape, Diameter 350Mm, Job 1- Ca-60 Steel Reinforcement - Screen, Job 1- Concrete Fck = 25, 0Mpa - Machined, Job 1- Concrete Fck = 30, Job 1- Concrete Pumping, Job 1- Mechanical Sanding On Concrete Surfaces, Job 1- Preparation And Application Of Stucco, Job 1- Concrete Polishing, Job 1- Supply And Assembly Of Vertical Metal Structure - Non-Skidable, Job 1- Steel Structure For Stairs, Walkways And Marquises, Including Assembly, Job 1- Precast Concrete Structure - Supply And Assembly, Job 1- Vb.01 - Masonry In Concrete Blocks 19 X 19 Concrete Pillars, Job 1- Supply And Installation Of Double-Sided Drywall Wall In Plasterboard Rf - 1Rf 12.5 + 1Rf 12.5, Job 1- Acoustic Insulation For Drywall System, Job 1- Thermal Insulation For Drywall System, Job 1- Neocon Standard Sanitary Partition Or Similar, Job 1- Carpet Type Textile Acoustic Absorber, Job 1- Hollow Concrete Element - Type Neo-Rex N.16 Or Similar, Job 1- Mechanical Protection With Cement And Sand Mortar - Mixture 1:7, Average Thickness 30Mm, Job 1- Waterproofing Mortar With Cement, Sand And Water-Repellent, Job 1- Bd.01 - Cement And Sand Waterproofing Mortar (Reservoirs And Swimming Pools) - Mixture 1:3, Thickness 30Mm, Job 1 - Asphalt Blanket 4Mm Thick With Polyester Veil Glued With A Torch, Job 1- Bd.12 - Waterproofing Based On Asphalt Emulsion - Structured With Polyester Fabric - 2 Structuring Layers, Job 1- Waterproofing With Asphalt Membrane - With 3 Layers Of Asphalt Felt 15Lbs, Job 1- Elastic Mastic Based On Polyurethane - Single-Component, Job 1- Supply Of Metallic Structure
|