Ancillary Works For Electricity Power Lines – Pesterzsébet And Laczkovich Naf Cable Connection. On The Basis Of A Business Contract, Pesterzsébet And Laczkovich 132 Kv Underground Cable Construction • Construction Of 4185 M2 132 Kv Cable Line, In A Densely Publicized Environment (Installation Of 6 Straight Connectors, 15 Cb Connectors, 3 Oil End Caps And 3 Gis End Caps And Installation Of 4 Cb Boxes), • 2 Pieces Suitable For Pulling In Optical Telecommunication Cables On The Same Route Construction Of A Substructure Consisting Of 4,277 Fm Protective Pipes And 13 Type N1 Breaker Facilities, The Creation Of Optical Connections, Making Optical Joints, With 4,730 Fm Optical Pull-In Cable, • Optical Network Construction Along The Route Of The 132 Kv Cable, As Well As Laying Out The Optical Cables In The Pesterzsébet And Laczkovich Substations. For The Construction, The 76/132 Kv 2Xs(Fl)2Y 3X1x1000rm/120 Mm² Cable, Which Meets The Required Technical Requirements, And The Appropriate Type And Size Cable Assemblies, Cross-Bond Cable, Cb Box And Overvoltage Limiter And Optical Cable - In The Quantity According To The Construction Plan - Will Be Provided To The Winning Bidder. The Data And Information Described In Points Bt-24 Of The Invitation Are Informative, The Detailed Conditions Are Recorded In The Draft Contract And The Technical Description.
Contact Information
Contact No.
+36 301401877
Email
Ingrid-Bernadett.Petri@eon-hungaria.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106662501
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.