|
Construction, Foundation And Surface Works For Highways, Roads – Design And Construction Of The S19 Expressway, Section Of The Province Border. Podlaskie – Łosice – Border Of The Province Lublin, Episode Implementation No. 1 Border Of The Province Podlaskie - Łosice Junction (Without Junction). The Subject Of The Order Is The Design And Construction Of The S19 Expressway On The Provincial Border Section. Podlaskie – Łosice – Border Of The Province Lublin, Episode Implementation No. 1 Border Of The Province Podlaskie - Łosice Junction (Without Junction), Located In The Province. Mazowieckie, In The Łosice Poviat In The Communes Of Sarnaki, Platerów And Łosice. The Scope Of The Order Includes The Performance Of All Design Works And Construction Works Necessary For The Implementation And Proper Operation Of The Expressway, Along With Obtaining The Required Decisions, Including: - Construction Of A Dual Carriageway Road Class S On Construction Section No. 1 From Km 0+000 To Km 17+263, - Construction Of A Road Junction, - Construction Of Mops, - Reconstruction Of Existing Roads In The Scope Of Collisions With The Expressway, - Construction/Reconstruction Of Roads Other Than The Expressway (Including Change The Course Of Existing Roads, Construction Of Roads Serving Areas Adjacent To The Investment And Restoring Damaged Road Connections), - Construction Of Engineering Structures Along The Expressway And Along The Roads And Railway Lines Intersecting With The Expressway, - Strengthening The Subsoil To Obtain Appropriate Conditions For The Foundation Of Roads And Engineering Structures And The Body Of High Embankments (E.G. Near The Facilities) Along With Surface Reinforcement Of Slopes, - Construction Of Technical Equipment For The Expressway, Including: Construction Of Drainage And Drainage Devices Water, Construction Of A Service Belt, Construction Of Emergency Crossings, Construction Of Road Fencing, Construction Of Networks And Infrastructure Related To The Road, - Construction Of Technical Devices For The Expressway (Including, Among Others, Marking The Expressway And Related Roads And Equipping Them With The Necessary Road Safety Devices, - Construction Of Environmental Protection Devices, Including: Anti-Noise Protection, Animal Crossings And Ecological Culverts Along With Protective And Guiding Fences, Planting Greenery, Other Necessary Ones Resulting From Environmental Decisions Conditions, - Reconstruction Of Devices And Networks Of The Existing Technical Infrastructure (Underground And Aboveground), Colliding With The Expressway And Related Roads. The Ordering Party Reserves The Obligation For The Contractor To Personally Perform Key Tasks, I.E. The Surface Of The Main Route, Including The Construction And Installation Of The Remaining Layers Of The Surface Structure Above The Native Soil (Excavation) Or Embankment (Embankment), With The Exception Of The Supply Of Materials And Services, With Respect To Key Tasks Reserved For Personal Performance By The Contractor Rely On The Capabilities Of The Entity Providing The Resources, Pursuant To The Principles Set Out In Article 118(1) Of The Public Procurement Law, In Order To Demonstrate Compliance With The Relevant Conditions For Participation In The Procedure. The Estimated Value Of The Contract Exceeds Eur 20,000,000
|