|
Construction, Foundation And Surface Works For Highways, Roads - Design And Construction Of The S19 Expressway On The Provincial Border Section. Podlaskie – Łosice – Border Of The Province Lublin, Episode Implementation No. 2: Łosice Junction (With Junction) - Voivodeship Border. Lublin Province. The Subject Of The Order Is The Design And Construction Of The S19 Expressway On The Provincial Border Section. Podlaskie – Łosice – Border Of The Province Lublin, Episode Implementation No. 2: Łosice Junction (With Junction) - Voivodeship Border. Lubelskie, Located In The Province Of Masovian Voivodeship In Łosice County In The Łosice Commune, Olszanka Commune And Huszlew Commune. The Scope Of The Order Includes The Performance Of All Design Works And Construction Works Necessary For The Implementation And Proper Operation Of The Expressway, Along With Obtaining The Required Decisions, Including: - Construction Of A Dual Carriageway Road Class S On Construction Section No. 2 From Km 17+263 To Km 31+725, - Construction Of Road Junctions, - Reconstruction Of Existing Roads In The Scope Of Collisions With The Expressway, - Construction/Reconstruction Of Roads Other Than The Expressway (Including Changing The Route Of Existing Roads, Construction Of Roads Servicing Areas Adjacent To The Investment And Restoring Damaged Road Connections), - Construction Of Engineering Structures Along The Expressway And Along The Roads Intersecting With The Expressway, - Strengthening The Subsoil To Obtain Appropriate Conditions For The Foundation Of Roads And Engineering Structures And The Body Of High Embankments (E.G. Near The Facilities) Along With Surface Reinforcement Of Slopes, - Construction Of Technical Equipment For The Expressway, Including: Construction Of Drainage And Water Drainage Devices, Construction Of A Service Belt, Construction Of Crossings Emergency, Construction Of Road Fencing, Construction Of Networks And Infrastructure Related To The Road, - Construction Of Technical Devices For The Expressway (Including, Among Others, Marking The Expressway And Related Roads And Equipping Them With The Necessary Road Safety Devices, - Construction Of Environmental Protection Devices, Including: Anti-Noise Protection, Animal Crossings And Ecological Culverts Along With Protective And Guiding Fences, Planting Greenery, Other Necessary Ones Resulting From The Decision On Environmental Conditions, - Reconstruction Of Devices And Networks Existing Technical Infrastructure (Underground And Aboveground), Colliding With The Expressway And Related Roads. The Ordering Party Reserves The Obligation For The Contractor To Personally Perform Key Tasks, I.E. The Surface Of The Main Route, Including The Construction And Installation Of The Remaining Layers Of The Surface Structure Above The Native Soil (Excavation) Or Embankment (Embankment), With The Exception Of The Supply Of Materials And Services, With Respect To Key Tasks Reserved For Personal Performance By The Contractor, The Contractor Cannot Rely On The Capabilities Of The Entity Providing The Services. Resources, In Accordance With The Principles Set Out In Article 118(1) Of The Public Procurement Law, In Order To Demonstrate Compliance With The Relevant Conditions For Participation In The Procedure
|