|
Supply And Commissioning Of Swas System Supply And Commissioning Of Swas System For Ntpc Projects , Primary Racks (With Ibr Certified Isolation Valves And Ibr Certified Inconel-625 Cooler Coils) , Wet Panel - Enclosed Type Walkway Through Panel , Dry Panel , Chiller Unit - 2X100% Redundant - Min. 5 Tr Rating (With 25% Extra Capacity) , Conductivity(Specific, Cation) Analyser- Single Channel , Conductivity(Specific) Analyser For Hotwell - Single Channel , Ph Analyser Transmitter- Single Channel , Ph Analyser Sensor- Single Channel , Dissolved Oxygenanalyser- Single Channel , Dissolved Oxygensensor- Single Channel , Sodiumanalyser [Multi Channel(5 Channel)+1 Spare Channel] , Silica Analyser [Multi Channel (4 Channel) +1 Spare Channel] , Hydrazine Analyser - Single Channel , Degassed Cation Conductivity Analyser , Turbidity Analyser Single Channel , Iron Analyser Single Channel , Loose Supply Items As Per Annexure-A , Mandatory Spares As Per Annexure- B - Shs , Mandatory Spares As Per Annexure- B - Analysers , Commissioning Spares- Reagents / Consumables / Calibratiors / Standard Solution As Required For Commissioning & Handing Over Of System To Owner , Chemical Reagents, Consumables And Standard Solutions For 18 Months Of Operation , Annunciator - Microprocessor Basedminimum 96 Points, Window Size : 70 Mm X 50 Mm , O & Mmanuals / Documentation Charges , Supervision Of Erection, Total Commissioning And Handing Over Of Swas System , Price For One Line Of High Pressure & High Temp. - Primary & Secondary Cooling To Be Considered Along With Other Instruments As Per P&Id Applicable For The Project. , Price For One Line Of Low Pressure & Low Temp. -Secondary Cooling To Be Considered Along With Other Instruments As Per P&Id Applicable For The Project. , Freight Charges For Ntpc Talcher 2 X 660 Mw (Lump Sum) , Freight Charges For Ntpc Lara 2 X 800 Mw(Lump Sum) , Freight Charges For Ntpc Singrauli 2 X 800 Mw (Lump Sum)
|