Demolition Of 3 Pigsty Buildings, Located On Plot No. 26/83 In The Town Of Radzim, Kamień Krajeński Commune, Sępoleński Poviat, Province. Kuyavian-Pomeranian Voivodeship. (Object Inventory No. 59/0080, 59/0081, 59/0100) The Subject Of The Order Includes, Among Others: 1. Piggery Inventory No. 59/0080• Preparation Of The Area And Its Marking,• Preparation Of A Place For Storing Demolition Materials,• Disassembly Of The Roofing Made Of Asbestos-Cement Boards Along With Segregation And Tidying Up Of The Damaged Roofing In The Collapsed Part,• Dismantling Of The Roof Structure Made Of Wooden Plank Girders,• Demolition Of The Wooden Ceiling Structure Above The Ground Floor Along With The Disassembly Of Thermal Insulation Made Of Mineral Wool And Moisture-Proof Insulation Made Of Felt Paper Asphalt, • Mechanical Dismantling Of Walls Above The Ground Level With Turning Them Inside, • Dismantling Of The Ground Floor Floor (Breaking), • Excavating The Foundations To A Depth Of Their Bottom And A Width Of Approx. 1.0 M (From The Internal Ceiling Of The Building), • Breaking The Foundation Elements Into Lumps, Extracting Them And Transporting Them From The Place Of Work, • Backfilling The Excavation And Basement With Excavated Soil (Not Rubble) And Density,• Tidying Up The Area,• Removal Of Post-Demolition Materials Owned By The Contractor From The Demolition Site And Disposal Of Hazardous Materials,• Preparation Of An As-Built Surveying Inventory And Reporting Of Registration Changes To The Appropriate District Office.2. Piggery Inventory No. 59/0081• Preparation Of The Area And Its Marking,• Preparation Of A Place For Storing Demolition Materials,• Disassembly Of The Covering Made Of Asbestos-Cement Boards,• Demolition Of The Roof Truss Structure,• Demolition Of The Reinforced Concrete Ceiling Above The Ground Floor,• Mechanical Dismantling Of The Walls Above The Ground Level With Turning Them Inwards,• Dismantling The Ground Floor Floor (Breaking),• Excavating The Foundations To The Depth Of Their Bottom And A Width Of Approx. 1.0 M (From The Inside Of The Building), • Breaking The Foundation Elements Into Solid Pieces, Extracting Them And Transporting Them From The Work Site, • Backfilling The Excavation And Basement With Excavated Soil (Not Rubble) And Compacting, • Tidying Up The Area, • Removing Post-Demolition Materials Owned By The Contractor From The Demolition Site And Disposing Of Hazardous Materials, • Performing An As-Built Geodetic Inventory And Reporting Changes To The Records To The Appropriate District Office.3. Pig House No. Inventory 59/0100• Preparation Of The Area And Its Marking,• Preparation Of A Place For Storing Demolition Materials,• Dismantling Of The Covering Made Of Asbestos-Cement Boards,• Demolition Of The Buildings Roof Truss Structure Along With Thermal Insulation Made Of Mineral Wool And Waterproofing Made Of Asphalt Felt,• Mechanical Dismantling Of Walls Above Ground Level With Turning Them Inwards,• Dismantling The Groun
|