|
1.1.0.1 Supply And Placement Of Work Sign Made Of Galvanized Sheet 26, Esp. 0.45 Mm, Plotted With Vinyl Adhesive, Affixed With 4.8X40 Mm Rivets, On Metal Structure Of Metalon 20X20 Mm, Special. 1, 25 Mm, Including Support In Autoclaved Eucalyptus Painted With Pva Paint Two (2) Coats, 1.2.0.1 Manual Removal Of Slab Lining (Gypsum, Mineral, Fiber, Styrofoam, Honeycomb, Pvc, Etc.), With Reuse, Including Removal And Stacking, Exclusive Demolition Of The Support Structure, Transportation And Removal Of Non-Reusable Removed Material, 1.2.0.2 Manual Removal Of Metal Frames, Including Frame/Alizar/Fittings, Spacing And Stacking, Excluding Transport And Removal Of Non-Reusable Removed Material, 1.2.0.3 Manual Demolition Of Ceramic Brick Or Concrete Block Masonry, Exclusive Transport And Removal Of Material Demolished, 1.2.0.4 Manual Demolition Of Reinforced Concrete Slab, With A Thickness Of Up To 15Cm, 12/22/2025 - 10:05:04, 12/22/2025 - 10:05:05, 1.2.0.5 Manual Demolition Of Ceramic Coating, Tile Or Hydraulic Tile, Exclusive Demolition Of Plaster Or Plaster, Transport And Removal Of Demolished Material, 1.2.0.6 Manual Removal Of Wooden Frames, Including Removal Of Frame/Grounds/Trims, 1.2.0.7 Removal Of Dishes (Washbasin, Bathtub, Sink, Toilet, Tank), 1.2.0.8 Manual Demolition Of Cemented Floor Or Subfloor Mortar, With A Maximum Thickness Of 10Cm, Including Spacing And Stacking, Excluding Transport And Removal Of The Demolished Material, 1.2.0.9 Manual Removal Of Metal Or Pvc Tiles, With Reuse, 1.2.0.10 Removal Of Gutter In Galvanized Sheet Or Pvc, 1.3.0.1 Manual Excavation Of Earth (Manual Excavation), Including Side Unloading, Excluding Removal And Transport Of Excavated Material, 1.3.0.2 Simple Drain Hole (Type A - Cast Iron), Frame, Grid And Angle, Including Excavation, Backfilling And Dumping, 1.3.0.3 Crushed Ballast With Crushed Stone Numbers 2 And 3, Including Densification And Piling Manual, 1.3.0.4 Supply And Laying Of Rigid Pvc Pipe, Drainage/Rainwater, Pbv - Normal Series, Dn 100 Mm (4), Inclusive, 1.3.0.5 Manual Trench Backfill, Including Manual Spreading And Compaction With Socket, 1.3.0.6 Subfloor Straightened With Mortar, Ratio 1:3 (Cement And Sand), Esp. 50Mm, Including Mortar With Mechanized Preparation, 1.4.1.1 Supply And Laying Of Rigid Pvc Pipe, Sewer, Dn 50 Mm (2), Including Connections, 1.4.1.2 Supply And Laying Of Rigid Pvc Pipe, Dn 75 Mm (3), 1.4.1.3 Supply And Laying Of Pipe Rigid Pvc, 1.4.1.4 Pvc Siphon Box With Round Grid 100 Af_06/2022, 1.4.2.3 Cutting And Bending Of Ca-25 Steel, Diameter Of 8, 1.4.2.4 Concreting Of Crowning Block Or Baldrame Beam, Fck 30 Mpa, Using A Pump - Laying, Densifying And Finishing. Af_01/2024, 1.4.2.5 Formwork And Stripping Of Board And Batten, Reuse (5X), Excluding Shoring, 1.4.2.6 Surface Waterproofing With Asphalt Emulsion, 2 Coats. Af_09/2023, 1.4.3.1 Cutting And Bending Of Ca-60 Steel, 1.4.3.2 Cutting And Bending Of Ca-25 Steel, Diameter Of 6.3 Mm. Af_06/2022, 1.4.3.3 Cutting And Bending Of Ca-25 Steel, 1.4.3.4 Concreting Of Pillars, Fck 25 Mpa, Densification And Finishing. Af_02/2022_Ps, 1.4.3.5 Concreting Of Beams And Slabs, Fck25 Mpa, For Solid Or Ribbed Slabs Using A Pump - Launch, 1.4.3.6 Formwork And D
|