|
1.1 - Engineer/Architect, Junior Level, Including Additional Charges, 2.1 - Rental Of Thermally Insulated Container, Type 3, For Storage/Construction Tooling, With Reference Measurements Of (6) Meters Length, (2, 3) Meters Width And (2, 5) Meters Internal Useful Height, Including Electrical Connections Internal, Exclusive Mobilization/Demobilization And External Temporary Connections, 2.2 - Temporary Connections For Type 3 Container (Corresponding To Code Ed-16350), 2.3 - Rental Of Container With Thermal Insulation, Type 1, For Construction Office, Including Air Conditioning And Internal Electrical Connections, Exclusive Mobilization/Demobilization And Connections External Temporary, 2.4 - Temporary Connections For Type 1 Container (Corresponding To Code Ed-16348), 2.5 - Mobilization And Demobilization Of Container, Including Loading, Unloading And Transport In A Truck With Crane (Munck), Exclusive Container Rental, 2.6 - Chemical Bathroom Rental, Size (110 X 120 Temporary Connection With Overhead Power Input, Cemig Standard, Installed Load From 15.1Kva To 30Kva, Three-Phase, With Underground Output, Including Pole, Meter Box, Circuit Breaker, Busbar, Grounding And Accessories, 2.9 - Fixed Protective Siding For Closing Works In Galvanized Metal Tile, Trapezoidal Type, Special. 0.5Mm, With Module Size Of (300X220)Cm, With Reuse, Exclusive Enamel Painting, Including Tip And Fixing, 2.10 - Removal Of Siding/Metallic And Wooden Sheets, Manually, Without Reuse. Af_09/2023, 3.1 - Supply And Placement Of Construction Sign In Galvanized Sheet #26, 45Mm, Dimension (3X1, 5)M, Plotted With Vinyl Adhesive, Affixed With Rivets4, 8X40mm, On Metal Structure Of Metalon 20X20mm, Special. 1, 25Mm, Including Support In Autoclaved Eucalyptus Painted With Pva Paint Two (2) Coats, 3.2 - Work Location With Template Of Running Boards Pointed Every 2.00M, Reuse (2X), Including Topographic Team Monitoring To Mark Topographic Point, 4.1 - Mechanized Cleaning Of The Vegetation Layer, 4.2 - Mechanized Demolition Of Reinforced Concrete, With Electrical Equipment, Including Removal And Stacking, Excluding Transport And Removal Of Demolished Material, 4.3 - Demolition Of Wall, 4.4 - Demolition Of Wall With Fencing, 4.5 - Mechanical Loading Of Material Of Any Nature On Truck, Exclusive Transport, 4.6 - Transport Of Material Of Any Nature In Truck, Distance Greater Than 2Km And Less Than Or Equal To 5Km, Within The Urban Perimeter, Excluding Loading, Including Unloading, 4.7 - Spreading Of Material With A Crawler Tractor. Af_09/2024, 5.1.1 - Horizontal Excavation, Including Loading, Unloading And Transport In 1St Category Soil With Crawler Tractor (100Hp/Blade: 2, 19M3) And Dump Truck Of 10M3, Dmt Up To 200M. Af_07/2020, 5.1.2 - Execution And Compaction Of Landfill Body (95% Of Normal Proctor Energy) With Predominantly Clay Soil Thickness 15 Cm - Exclusive Material, Excavation, Loading And Transport. Af_09/2024, 5.2.1 - Clay Or Clay For Landfill/Backfill (Removed From The Deposit, Without Transportation), 5.2.2 Mechanical Load Of Material Of Any Nature S
|