|
Provision Of Cleaning Services For The Evaporator And Condenser With Removal, Disassembly/Complete Washing With Isolation Of Electrical Parts, Reassembly And Reinstallation Of Air Conditioning Up To 30,000 Btus. Present The Operation Relating To The Installed Equipment., Reassembly And Reinstallation Of Air Conditioning Up To 48,000 Btus With Removal. Present The Operation Relating To The Installed Equipment., Provision Of Cleaning Service For Air Conditioning Internal Evaporator Part With The Collection Bag Up To 30,000 Btus, Provision Of Cleaning Service For Air Conditioning Internal Part Evaporator With The Collection Bag Above 30,000 To 48,000 Btus, Labor For Repairs, Repairs And Maintenance In Air Conditioning Devices., 12/22/2025 - 08:00:03, 12/22/2025 - 08:39:26, 12/22/2025 - 08:39:27, 12/22/2025 - 08:39:28, R-22 Gas Charge For Air Conditioners Up To Service Provision For Installation Of Split And Inverter Type Air Conditioning Devices In Municipal Public Buildings, Provision Of Service For Uninstallation Of Air Conditioning, Pvc Tape For Installation Of Air Conditioning Equipment, 100Mm 5 Mm, 1/4 Copper Pipe For Installing Air Conditioning Equipment, 3/8 Copper Pipe For Installing Air Conditioning Equipment., 1/2 Copper Pipe For Installing Air Conditioning Equipment., 5/8 Copper Pipe For Installing Air Conditioning Equipment., 3/4 Copper Pipe For Installing Air Conditioning Equipment., Support For Split Air Conditioning 9,000 To 12,000 Btus., Support For Split Air Conditioning 18,000 To 30,000 Btus., Support For Floor/Ceiling Air Conditioning 48,000 And 60,000 Btus.
|