Railway Bridge Construction Work - Rehabilitation Works For Railway Bridges, Underpasses And Tunnels - Stage Ii, Srcf Timișoara - Bridge Km 57+143, Bridge Km 58+803 Line C.F. 116 Petroșani - Simeria (Design And Execution). A. Design Services The Technical Project Will Be Developed According To The Legal Regulations In Force, Respectively Hg 907/2016 Regarding The Stages Of Development And The Framework Content Of The Technical-Economic Documentation Related To The Investment Objectives/Projects Financed From Public Funds, With Subsequent Amendments. The Technical-Economic Documentation Can Only Be Made By Specialized Designers Who Hold The Railway Technical Approvals Issued By Afer For Design And Expertise Services In The Field Of Railway Infrastructure, Iso 9001 Quality System Attestation Certificates, Issued By Accredited Bodies And Have Appropriate Technical Means Of Design And Verification. The Project Will Be Approved By Certified Project Verifiers M.L.P.T.L./M.L.P.A.T./Mt. B. Execution Works The Works Will Be Executed In Accordance With The Approved Technical Project, In The Technological Order Of Execution, With Strict Compliance With The Program For Controlling The Quality Of The Works And The Determining Phases. The Effective Execution Of The Designed Works Will Begin Based On The Order To Start The Works, Only After Obtaining The Favorable Opinion Of The Technical - Economic Council Of Cncf Cfr- Sa Related To The Technical Project. The Executor Will Have Technical Means Corresponding To The Fulfillment Of The Requirements Of The Technical Project And Will Hold Authorizations And Railway Technical Approvals Issued By The Corresponding Afer, As Well As Certificates Of Attestation Of The Quality System, Issued By Accredited Bodies. Description Of The Artwork - Current Situation: For Bridge Km 57+143: The Bridge At Km 57+143 Is On The Double Electrified Railway Line 116 Petroșani - Simeria, In Hm Crivadia, With The Normal Axis On The Valley That Crosses It. On Floor I, The Footbridge Is A Stone Masonry Vault Type, With Lu=2.74-2.85M, And On Floor Ii, It Is A Concrete Vault With Lu=2.85M. For Bridge Km 58+803: The Bridge At Km 58+803 Is On The Double Electrified Railway Line 116 Petroșani - Simeria, Between Hm Crivadia And Hm Merișor, With The Normal Axis On The Valley That Crosses It. The Bridge Consists Of A Stone Vault, With A Span Of 6.50 M, And The Length Is 15.75 M (Dn66 Area) + 31.80 M (C.F. Area). In The Extension Of The Railway Bridge On D Ii, A Vaulted Concrete Bridge With A Span Of 5.00 M Was Built In 1964, Which Serves The Adjacent Downstream Road (Pod Km 149+600 On Dn 66 /E79). No. Crt. Bridge Km. Design Services Work Execution Information And Publicity Implementation Reserves Miscellaneous And Contingencies 1 57+143 89,244.15 2,221,590.59 65,800.00 180,951.41 45,237.85 2 58+803 98,915.92 - Bridge Km 57+143, Bridge Km 58+803 Line C.F. 116 Petroșani - Simeria (Design And Execution) Is: 5,366,387.87 Lei Without Vat.
|