Structural Shell Work – Advanced Shell Work. Description Of The Service: The Listed Building Of The Museum Of Hamburg History Is To Be Renovated And Converted. The Planned Measures Include The Comprehensive Modernization And Renovation Of All Floors With A Focus On The Necessary Structural Measures To Refurnish The Permanent Exhibition On The 1St And 2Nd Floors, As Well As The Redesign And Restructuring Of The Visitor Infrastructure, Information Areas, Museum Shop And Restaurant. The Museum Has A Net Floor Area Of Approx. 13,400M² With A Gross Floor Area Of Approx. 17,500M². In Addition, There Is The Covered Inner Courtyard And The Outdoor Facilities, Which Are Also Considered As Part Of The Measures. // This List Of Services Concerns Extended Shell Construction Work Indoors And Outdoors. In Addition To The New Construction, Additions And Renovation Work, Structural Demolition Work Must Also Be Carried Out, In Particular These Relate To The Freight Elevator And Passenger Elevator As Well As The Outdoor Terrace, Which Also Needs To Be Enlarged. When Carrying Out The Demolition And New Construction Work On The Two Elevator Shafts, The Specifications And Construction Processes Of The Structural Planning Must Be Observed. When Dismantling The Outdoor Terrace, Special Care Must Be Taken As Both The Existing Masonry And The Built-In Natural Stone Parapet Elements Are To Be Used For The Later Reinstallation Of The Enlarged Terrace. Otherwise, Measures Such As Opening And Then Re-Closing Ceiling And Floor Slab Areas Are Essentially Planned, E.G. For The Installation Of Strip Foundations And General New Construction Or Upgrade Measures. In Addition To A Large Number Of Smaller Conversions, Additions And Renovation Measures In Some Areas, The Existing Concrete Ribbed Ceilings In Some Areas Have To Be Supported Using Steel Beams. The Services Essentially Include The Following Content: - Demolition And New Construction Of Mw Walls For The Freight Elevator And Passenger Elevator (Approx. 280 M2) - Demolition And New Construction Of Mw Walls Made Of Solid Clinker Bricks On The Terrace (Approx. 140 M2) - New Construction Of Ceiling Slabs Made Of Reinforced Concrete Or Semi-Prefabricated Ceiling Slabs On The Terrace (Approx. 255M2) - Installation Of Prefabricated Angle Retaining Wall Elements In Different Dimensions, Uk Terrace (Approx. 20 Pieces) - New Construction Of Other Reinforced Concrete Ceiling Slabs Or Ceiling Slab Areas (Approx. 300 M2) - Installation Of In-Situ Concrete Strip Foundations (Approx. 60 M3) - In-Situ Concrete Floor Slabs Or Floor Slab Areas (Approx. 850 M2) - Installation Of Steel Beams Hea, Heb, Ipe & Upe Beams (Approx. 750 M) - New Construction Of Other Mw Walls Or Wall Areas (Approx. 800 M2) - Core Drillings In Different Diameters (Approx. 1150 Pieces) - Renovation For Component Reinforcements And Concrete Spalling Of Different Dimensions (Approx. 150 Units) - Fire Protection Upgrade Of Interior Plaster On Ceilings (Approx. 2000 M2)
Contact Information
Address
Burchardstraße 8
Contact No.
+49 40339540
Email
vergabestelle@sprinkenhof.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106520388
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.