|
Engineering Design Services For Traffic Installations – Ta0b - Nedlitzer Straße/ Ta1, Ta2 - Jungfernsee Campus - Fahrland School. 1. Service Package 1 - Planning Services For Traffic Systems (§ 47 Hoai) The Contractor Provides All Services To Create A Complete, Approvable Plan For The Traffic Systems (Track, Road And Path Construction, Stops, Etc.). The Basis Is The Documents Provided By The Client; Checking, Supplementing Or Replacing Them Is Entirely The Responsibility Of The Contractor. The Client Assumes No Liability For Their Accuracy Or Completeness. 1.1 Examination Of The Requirement To Avoid Environmental Interventions Analysis Of The Planning With Regard To Minimizing Interventions (Including Preservation Of Heldbock Trees, Avenues, Other Trees). Integration Of Necessary Protective Measures Into The Planning. Preparation Of An Auditable Report As Part Of The Explanatory Report. 1.2 Statements And Objections Examination, Evaluation And Technical Processing Of Up To 100 Objections/Statements. Any Necessary Adjustments Must Be Made In Coordination With The Client. Preparation Of Responses And Documentation. 1.3 Re-Shaping Re-Shaping Of The Axes And Gradients In Cad And Creation Of A Complete Digital Elevation Model. 1.4 Update Of The Planning Approval Documents Updating Of All Affected Documents Based On Examination, Statements And Plan Adjustments. This Includes In Particular: - Explanatory Report (U01): Checking, Optimizing, Updating, Etc. On Project Definition, Construction Process, Drainage, Plan Justification, Compelling Public Interests, Variant Investigation, Necessary Permits/Exceptions. - Site Plans (U05): Examination And Revision Including Integration Of Environmental Results, Drainage, Signage, Envelope Curves, Third-Party Planning, Construction Site Setup, Monument Protection Areas, Adjustments To Upstallgraben, Cycle Traffic Facilities. - Drainage / Water Law (U08, U18): Review, Revision, Addition; Preparation Of All Necessary Water Law Applications. - Land Acquisition (U10): Examination, Revision, Creation Of Individual Plans For All Permanent And Temporary Uses. - List Of Regulations (U11): Complete Update. - Road Cross Sections (U14): Testing, Standardization; Integration Of All Relevant Planning Content (Superstructure, Clearance, Marking, Drainage, Trees, Accessibility, Crossings). - Line Plans (U16-01): Review, Revision Including Ewp, Ontras/Gasline Adjustments; Additional Cross Sections For Underground Supply Space. - Construction Phase Plans (U16-02): Examination And Revision Taking Into Account Minimum Traffic Standards (E.G. 2-Lane Guidance, Lsa Regulations, Safe Crossings) As Well As Integration Of Media Relocation And Environmental Requirements. - Envelope And Drag Curves (U16-03): Testing And Revision To Ensure Freedom From Conflicts. 1.5 Emergency Concept Creation Of A Comprehensive Emergency Concept For All Construction Activities In The Drinking Water Protection Zone Of The Nedlitz Waterworks. 1.6 Compilation Of Documents & Applications Complete, Verifiable
|