Construction Work – Tender For Locksmith/Steel Construction Work (317) For The New Building Of The Akk. 1St Floor: On The 1St Floor, North Wing, The Conversion Will Create 8 Additional Patient Rooms Within The Existing Building Volume. It Is Possible To Set Up An Additional Bed For An Accompanying Person In Each Room. Each Patient Room Has Its Own Bathroom. The New Spatial Concept Entails An Adjustment For The Entire Floor Including The South Wing, As The Station Processes For Operating The North Wing Have To Be Reorganized. This Applies To The Following Rooms: 1.39 Laundry Storage, 1.20 Parent Stay/Play. To Connect The New Areas To The Existing Building, Suspended Ceilings Are Dismantled And Reinstalled, Including In The Hallways. In Order To Create The Necessary Escape Routes, The Temporary External Staircase Will Be Replaced By A Permanent External Staircase As Part Of The Renovation. It Is Also Led To The Roof Area Above The 1St Floor For Maintenance Purposes. To Prevent Fire From Spreading To The Stairs, A Fire Barrier Is Installed. The Static System Of The Existing Building Is Based On An Identical Position Of The Load-Bearing Walls On The Ground And Upper Floors. This Cannot Be Easily Implemented Due To The New Spatial Program And The Resulting Floor Plan. The Previous Load Transfer Through Load-Bearing Walls Will Be Changed. Beams And Supports Are Installed To Transfer Loads. Ground Floor: Based On The Existing Structure, Two Shared Bathrooms Will Be Converted Into Two Individual Bathrooms For Hygiene Reasons. Currently, In The Event Of An Infection, The Shared Bathrooms Must Be Closed To The Non-Infected Side. In The Clinical Ventilation Areas On The Ground Floor, 2 Patient Bathrooms Are Shared, Creating 4 Patient Bathrooms. The Changed Load Transfer Requires The Installation Of An Additional Support In The Area Where The Parents Stay. In Individual Areas, Interventions In The Existing Tga Installations Are Necessary. To Do This, Existing Ceilings Must Be Opened And Closed Again. Basement: The Changed Load Transfer Requires The Installation Of Two Additional Supports In Front Of And In The Area Of The Room Of Silence. Construction: Non-Load-Bearing Interior Walls: Plasterboard Stud Walls, Designed According To Fire And Moisture Protection Requirements. The Beam Below The Ceiling Above The 1St Floor Is Made As A Steel Support Structure. The Supports Below The Beam On The 1St Floor As Well As The Additional Supports On The Ground Floor And Basement Are Designed As Steel Supports. Steel Beams And Steel Columns On All Floors Receive A Fire Protection Coating. The External Staircase Including A Fire Protection Bulkhead In Lightweight Construction Is Intended As A Steel Stringer Staircase With Grating Steps And Platforms. More Detailed Details Can Be Found In The Tender Documents (In Particular The List Of Services).
Contact Information
Address
Bleickenallee 38
Contact No.
+49 40 35 52 80 836
Email
sekretariat.schellenberg@heuking.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106519945
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.