|
Various Surface Works - Engineering - Design, Construction And Authors Supervision For Site Rehabilitation Of Road Shu 1187 /I-7, O.P. Shumen - O.P. Veliki Preslav/ Marash - Salmanovo To Road Shu 1190. Site Implementation: Engineering - Design, Construction And Author Supervision For The Site Rehabilitation Of Road Shu 1187 /I-7, O.P.Shumen-O.P.Veliki Preslav/ Marash - Salmanovo To Road Shu 1190 Is The Preparation Of A Technical Solution For Restoring The Normal Functioning Of The Road Section, The Safety Of Automobile Traffic, Increasing The Service Life Of The Road And Its Adjacent Facilities - Road Pavement, Banquettes, Ditches, Bridges, Culverts, Adjacent Vegetation, Road Signaling - Road Signs, Markings, Etc. Municipal Road Shu 1187 Starts From Republic Road I-7, Passes Through The Villages Of Marash And Salmanovo, And Reaches Road Shu 1190. The Road Surface, Equipment And Accessories Of The Road Are Heavily Depreciated, As There Have Been Ongoing Repairs, But No Major Repairs, Over The Past 30+ Years. In This Regard, This Order Aims To Carry Out A Major Repair Of The Road In The Section From The Republican Road I-7 To The Intersection With Road Shu 1190. As A Result Of The Implementation Of The Project, The Process Of Demolishing The Asphalt Pavement Will Be Stopped, The Bearing Capacity, The Evenness Of The Pavement And The Drainage Of Surface Water On The Road Will Be Guaranteed. Traffic Safety Will Be Improved And Vehicle Operating Costs Will Be Reduced. The Construction Is: Second Group, Third Category, On The Basis Of Article 137, Paragraph 1, Item 3, Letter A Of Zut And Article 6, Paragraph 1, Item 1 Of Ordinance No. 1/30.07.2003. For The Nomenclature Of Construction Types The Following Activities Will Be Carried Out: Activity 1. Preparation Of An Investment Project In The Technical Phase And Exercise Of Author Supervision During The Implementation Of The Smr Of The Site For The Following Parts Of The Investment Project: Part Geodesy, Part Road, Part Structural, Part Waterworks, Part Vobd, Part Permanent Organization Of Traffic, Part Fire Safety, Part Pbz, Part Puso, Accounting Documentation, According To The Requirements Of Zut And The Current Sub-Normative Regulation, Specified In Technical Specification To This Documentation; Activity Ii. Implementation Of The Smr On The Basis Of The Developed And Approved Technical Investment Project, In Compliance With The Requirements Of All Laws, Rules, Regulations In Force In The Republic Of Bulgaria At The Moment, Regarding The Implementation Of Objects And Works Of Such A Nature, According To The Technical Specifications Of The Public Procurement. The Cmp Activities To Be Carried Out Include: Site Preparation /Preparatory Works/ Staking Out On The Ground When Starting Work, The Contractor Must Stake Out All Points, Baselines And Levels As Per The Design. The Levels Indicated In The Drawings Are Relative To The Baltic Height System. Underground Infrastructure Introduction Of Temporary Organization Of Traffic Execution Of Construction And Assembly Works And Any Other Accompanying And Related Activities Necessary For The Implementation Of The Construction, In Accordance With The Regulatory Requirements, The Approved Investment Project, Quantitative
|