Construction Work – Construction Of Three Multi-Family Residential Buildings With Construction Equipment In Dobrzelów - Bełchatów Commune. The Subject Of The Order Is The Implementation Of Construction Works As Part Of The Investment Project Titled: Construction Of Three Multi-Family Residential Buildings With Construction Equipment In Dobrzelów - Bełchatów Commune Along With Obtaining A Final And Unconditional Permit For The Use Of The Buildings. Iii. Formal And Legal Documents 1. Decision No. 697.2023 Of September 13, 2023, The Building Permit Issued By The Starosta Of Bełchatów, On October 3, 2023, Became Final; 2. Decision, Reference Number Po.Zuz.5.4210.349.2023.Mb Of July 17, 2023 On Granting A Water Permit; 3. Resolution, Ref. No. Po.Zpu.5.522.2070.2022.Kg Of June 8, 2023 On Agreeing On The Draft Decision In The Field Of Water Improvement; 4. Decision No. 33/2023 Of July 10, 2023. For The Location Of Technical Infrastructure Facilities In The Municipal Public Road, Issued By The Mayor Of The Bełchatów Commune, Plot No. 423, Dobrzelów District, Bełchatów Commune; 5. Consent Of The Commune Office Of July 10, 2023 For The Location Of Technical Infrastructure Facilities In The Road, Plot No. 406, Dobrzelów District, Bełchatów Commune. Iv. Investment Location: Address: Plot No. 405, Precinct 5 Dobrzelów, Bełchatów Commune; Scope Of Work - In Accordance With The Building Permit Obtained, The Scope Of Work To Be Performed Is: Construction Of Three Multi-Family Residential Buildings With Construction Equipment, Plot No. 405, Precinct 5 Dobrzelów, Bełchatów Commune. The Scope Of The Order Includes: 1. Construction Of Three Multi-Family Residential Buildings: • Preparatory Works, Earthworks • Masonry And Reinforced Concrete Works • Elevator Shafts With Delivery And Installation Of Cranes • Roofs • Finishing Works 2. Construction Of Internal Installations: • Water Supply, Hot Water And Sanitary Sewage, • Electricity And Telecommunications • Central Heating With Heat Pumps • Ventilation Installation • Air Conditioning Installation With Heating Function • System Smoke Removal 3. Construction Of External Installations And Connections: • Water Supply And Sanitary Sewage • Expansion Of The Water Supply Network • Electricity And Telecommunications 4. Construction Of Area Lighting Installations; 5. Construction Of A Photovoltaic Installation 6. Paving Works • Construction Of A Parking Lot For 60 External Parking Spaces, Including 3 For Disabled People, And Installation Of Channels For Electric Wires And Cables At All Parking Positions, Enabling The Installation Of Charging Points At Each Parking Position For Charging Electric Vehicles In Accordance With The Act Of January 11, 2018 On Electromobility And Alternative Fuels. • Hardening Of Roads And Access Roads With Concrete Blocks 7. Construction Of Three Garbage Shelters Made Of Openwork Walls For Airtight Containers For Solid Waste; 8. Small Architecture, Biologically Active Area; 9. Commissioning Of All Technological Systems Together With Acceptance By The Office Of Technical Inspection (Where Required) 10. Preparation Of As-Built Documentation, 11. Testimony
|