1. Description Of The Subject Of The Order: 1.1. The Existing Sewage Pumping Stations Serve The Sanitary Sewage Network In Jastrzębie, Cascading Sewage Into The Sanitary Sewage System With An Outlet In An Expansion Well At Ul. Kościelna In Drzycim. Due To The Wear And Corrosion Of The Working Elements Of The Existing Pumping Station And The Gate Valve Chamber And Pump Control, It Is Planned To Modernize The Sewage Pumping Station By Replacing The Working Elements Of The Pumping Station, The Gate Valve Chamber And The Control Cabinet And Pumping Station Equipment. The Scope Of The Investment Includes: - Cleaning The Existing Chambers Of The Pk-1 And Pk-2 Pumping Stations, Together With The Removal And Management Of Waste; - Construction Of A Bypass For The Current Operation Of The Sewage System, Closing The Sewage Inflow To The Pumping Station In Order To Perform The Work Or Transporting Sewage To The Sewage Treatment Plant Located In Drzycim At Ul. Młyńska 18A, - Removal Of The Bypass Constructed During The Works - If Applicable; - Installation Of New Pump, Stop And Return Fittings In The Existing Intake Tanks Of The Pk-1 And Pk-2 Sewage Pumping Stations And The Existing Gate Valve Chambers Along With Process Pipelines Inside The Chambers And Between Them, - Installation Of Control Cabinets For Each Of The Sewage Pumping Stations Along With Their Power Supply From The Existing Wlz Connections, - Installation Of Poles Lighting And Their Power Supply, - Expansion Of The Existing Visualization And Monitoring System Based On Gprs Packet Data Transmission, Which Is Installed And Operates At The Municipal Utilities Department In Drzycim At Ul. Młyńska 18A;- The Contractor Will Commission The Pumping Station. Note: The Ordering Party Has A Licensed Hydronetwebv6 Monitoring And Visualization System, The Integrator Of Which Is Hydro-Partner Sp. Z O. O. From Leszno. The Modernized Sewage Pumping Station Described In The Design And Technical Documentation And In The Swz Is To Be Covered By The Expansion Of The Existing Visualization And Monitoring System Based On Gprs Packet Data Transmission, Which Is Installed And Operates At The Ordering Partys. The Pumping Station Software Is To Be Integrated And Compatible With The Existing Monitoring System. The Expansion Of The System Should Be Carried Out By Marking The Pumping Station On The Existing Synoptic Map At The Dispatch Station Located At The Headquarters Of The Operator Of Municipal Sewage Networks. At The Same Time, The Ordering Party Stipulates That The Existing And Functioning Control And Monitoring System Based On Gprs Packet Data Transmission Cannot Be Changed To Another One. The Possibility Of Cooperation Between Two Or More Different Control And Monitoring Systems Is Also Not Allowed Due To The Costs Of Future Operation Of The Sewage Pumping Station. As Part Of The Task Implementation, The Contractor Is Obliged To: - Prepare A Safety And Health Protection Plan Before The Commencement Of The Works,
Contact Information
Address
Gmina Drzycim,Drzycim,86-140,Kujawsko-Pomorskie,Pl618 - Świecki
Contact No.
523317079
Email
ug@drzycim.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106478828
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.