|
Supply And Placement Of Work Sign Made Of Galvanized Sheet #26, Esp. 0.45 Mm, Plotted With Vinyl Adhesive, Affixed With 4.8X40 Mm Rivets, On Metal Structure Of Metalon 20X20 Mm, Special. 1, 25 Mm, Inclusive Suporte Em Eucalipto Autoclavado Pintado Com Tinta Pva Duas (2) Demãos, Barracão De Obra, Em Chapa De Compensado Resinado, Inclusive Instalações Sanitárias E Mobiliário - Padrão Der-Mg, Escavação Mecânica Em Material De 1ª Categoria, Inclusive Carga Em Caminhão, Exclusive Transporte E Descarga, Locação Topográfica Para Até Vinte (20) Pontos Referenciais, Inclusive Estaca (Piquete) De Marcação, Mobilização E Desmobilização De Equipamento Para Estaca Tipo Cravada (Custo Fixo), Inclusive Carga E Descarga, Exclusive Transporte Em Quilômetro Rodado (Custovariável), 18/12/2025 - 09:47:07, Cravação De Estaca Pré-Moldada De Concreto, Dimensão (20X20)Cm, Compressão Admissível De 50T, Inclusive Fornecimento De Estaca, Exclusive Emenda, Emenda De Estaca Pré-Moldada, Inclusive Anel/Luva Metálico E Solda, Exclusive Fornecimento Da Estaca, Corte, Dobra E Montagem De Aço Ca-50, Diâmetro (6, 3Mm A 12, 5Mm), Inclusive Espaçador, Fornecimento De Concreto Estrutural, Preparado Em Obra, Com Fck 20Mpa, Inclusive Lançamento, Adensamento E Acabamento, Fôrma E Desforma De Compensado Plastificado, Esp. 12Mm, Reuse, Mechanized Demolition Of Reinforced Concrete, With Pneumatic Equipment, Including Removal And Stacking, Exclusive Transport And Removal Of Pneumatic Demolished Material, Including Removal, Bending And Assembly Of Ca-50 Steel Diameter (6, Esp.12Mm, Reuse (3X), Exclusive Shoring, Neoprene Wedge 100 X 100 External, Height 130Cm, In Galvanized Tube, With Seam, Diameter Of 2, 3Mm Spacer, Grating With Flat Bar Frame (1.1/4X3/16) Vertical Division In Flat Bar (1.1/2X3/16), Exclusive Painting, Solvent Based Enamel Painting On Metal Structure, Two (2) Coats, With Manual Application, Including One (1) Galvanized Bottom Coat, Supply And Laying Of Rigid Pvc Pipe, Sewerage, Pbv - Reinforced Series, Dn 75 Mm (3), Including Connections, Excavation, Loading And Transport Of 1St Category Material - Executed With A 1, 40 M3 Excavator And A 12 M3 Dump Truck And With Service Path In Natural Bed - Dmt 1,800 To 2,000 M, Mechanical Compaction Of Landfill With Vibrating Roller At 95% Of Normal Proctor, Including Spreading, Final Cleaning For Delivery Of The Work
|