|
Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Comp. Aux. Civil1execution Of Warehouse On Construction Site In Plywood Sheet, Including Shelves., Manual Excavation Of Trenches In 1St And/Or 2Nd Category Material Up To 1.50 M Deep, Manual Leveling Of The Bottom Of Trenches 0.15 M With Material From The Excavation, (For Laying Pipes)., Tube, Ocher Pvc, Elastic Joint, Dn 100 Mm, For Building Sewage Collector. Af_06/2022, 18/12/2025 - 13:40:13, Dn 150 Mm, Backfill With Sand With Hydraulic Densification, Concrete Fck = 15Mpa, Mixture 1:3, 4:3, 5 (In Dry Mass Of Cement/Medium Sand/Gravel 1) - Mechanical Preparation With Concrete Mixer 600 L. Af_05/2021, Manual Trench Backfilling, With Vibrating Plate. Af_08/2023, Manual Excavation In 1St Category Material At A Depth Of Up To 1 M, Regularization Of Trenches With Bottom Piping, Lean Concrete - Production In A Concrete Mixer And Manual Throwing - Commercial Sand And Crushed Stone, 5 (In Dry Cement Mass/Medium Sand/Gravel 1) - Mechanical Preparation With A 400 L Concrete Mixer. Af_05/2021, Launching Using Buckets, Densification And Concrete Finishing In Structures. Af_02/2022, Basement Masonry In Solid Ceramic Bricks 5X10x20cm, Laid With Mortar Traco 1:2:8 (Cement, Lime And Sand), Chapisco Applied To Masonry And Internal Concrete Structures, With A Trowel. Mortar Trace 1:3 With Manual Preparation. Af_10/2022, Single Mass Coating. (In The Process Of Discontinuation)., Manual Backfilling With Mechanical Piling, Reinforced Concrete Cover 70 Sandy, For Pavement Construction Works. Af_09/2024, Loading, Maneuvering And Unloading Soil And Granular Materials In A 18 M³ Dump Truck - Loading With Hydraulic Excavator (1.20 M³ / 155 Hp Bucket) And Free Unloading (Unit: M3). Af_07/2020, Guide Laying (Curb) In Straight Section, Made Of Prefabricated Concrete, Dimensions 100X15x13x30 Cm (Length X Lower Base X Upper Base X Height). Af_01/2024, Laying Of Guide (Curb) In Curved Section, Slim Concrete Ballast, Applied To Floors, Slabs On Ground Or Radiators. Af_01/2024, Execution Of A Water Line With Granite Stone Cobblestones, 25Cm Wide, Placed On A Cement And Sand Mattress In A Volumetric Ratio Of 1:8 On A Lean Concrete Ballast With A Thickness Of 10Cm, Grouting With Mortar With A 1:3 Ratio (Cement And Sand)., Local Administration
|