|
Construction Work – Pergamonmuseum, Basic Repairs And Additions To Construction Phase B - Shell Construction Work, Expansion Of Pergamonsteg - Award 2730/2025. Construction Site Equipment: Construction Site Equipment For Overall Performance Pergamonsteg On The Bank; Construction Site Equipment In The Water, Copper Trench; Transport Planning For The Bridge Girders, Including Drawings; Applying For And Obtaining All Necessary Official Permits For The Transport Of Large Equipment, Heavy And Long Transport Of Components On Public Roads; Technical Processing Of The Bridge: Carrying Out Vibration Measurements On The Bridge Superstructure; Measurement During Construction By A Publicly Appointed Surveyor (Öbvi) Including Documentation. Scaffolding Work: Work Scaffolding For Facade Cladding, Approx. 390 M2; Supporting Scaffolding, Approx. 430 M3; Supporting Scaffolding, Approx. 90 M2. Concrete Work: Multi-Storey Reinforced Concrete Construction As A Head Building On The West Side Of The Bridge, L/W Approx. 20.50/4.80 M, As A “White Tank” With Waterproof Concrete; Approx. 450 M3; Bridge Superstructure As A Steel Composite Construction, Ceiling Slab, Thickness 20-25 Cm, On A Steel Trapezoid Profile, Dimensions L/W Approx. 24.00/20.50 M, Approx. 500 M2; Prefabricated Reinforced Concrete Parts As Vibration Dampers, 13 Pieces. Steel Construction Work: Steel Construction Work Bridge Superstructure S235j2, Exc 3, Steel Composite Girder Made Of Welded Sheet Metal Girders With Cant, Height 800 Mm, Length Approx. 24.00 M, Approx. 165 T; Cross Beam In Short Pieces Made From Heb Beams, Approx. 9 T; Vibration Damper Made Of Steel Plates, Approx. 2 T. Corrosion Protection Work: Corrosion Protection C3 On The Steel Structure Of The Bridge And The Vibration Dampers, Approx. 176 T; Sealing Work: Horizontal Sealing Of Bridge, Approx. 510 M2; Sealing Of External Stairs Made Of Reinforced Concrete, Approx. 80 M2; Roof Sealing Of Elevator Towers, Approx. 25 M2; Internal Sealing Of The Rainwater Discharge Structure With Liquid Plastic, Approx. 62 M2 In Total; Base Sealing Of The Outer Wall Of The Head Building, Approx. 45 M2. Mastic Asphalt Work: Mastic Asphalt Protective Layer On Separating Layer On The Polymer Bitumen Sealing Of The Bridge Superstructure, Approx. 510 M2. Metal Construction Work: Bridge And Stair Railings Made Of Steel, Partly Stainless Steel, Approx. 82 M; Grating Walkways And Platforms Including Steel Substructure And Railings, Including Corrosion Protection In The Duplex System. Stainless Steel Expansion Elements For The Elevator Towers; Drain Cover On The Bridge Made Of Cast Aluminum Grid, 32 Pieces; Natural Stone Work: Facade Cladding D 15 Cm Made Of Natural Stone Slabs Of Shell Limestone, As Permanent Formwork For The Waterproof Wall, Approx. 8 M2; Execution Of The Solid Bank Wall And Head Structure Cladding, Panel Thickness 15 Cm, Approx. 200 M2 With Ready-To-Install Natural Stone Panels Provided By The Client; Substructure Made Of Stainless Steel According To The Contractors Planning And Statics, Assembly Of The Shell Limestone Natural Stone Slabs Prefabricated And Provided By The Client, For: Side Cladding Bridge, Approx. 50 M; Ventilated Facade Cladding Elevator Towers, Approx. 175 M2; Roof Coverings On Pedestals, Approx. 20 M2; Bridge Floor Covering Made Of Large Granite Slabs On A Bed Of Gravel, Approx. 500 M2; Natural Stone Wedge Steps Made Of Granite, Approx. 230 M; Granite Benches, 8 Pieces; Painting And Varnishing Work: Antistatically Dissipative
|