Bridge Construction Work – B304 Bruecke Ueber Db Bei Strass. With The New Replacement Building, The 2-Lane Federal Highway B 304 Will Be Routed Over The 2-Track, Electrified Db Line 5703. The Location Of The New Bridge Is Adjacent To The Existing Bridge, Which Must Be Demolished Before The New Bridge Can Be Built. The New Bridge Is A Flat (Rock) Founded Frame Structure With 5 Prefabricated Steel Composite Girders And An Inclination Of 50 Gon. Road Construction (Relocation Of The B 304) Is Not The Subject Of This Measure. Main Masses: Reinforced Concrete: Approx. 1,600 M³ Reinforcing Steel: Approx. 230 Tons Vft Beams: 5 Pieces (5.3 Tons Of Structural Steel And 13 Tons Of Reinforced Concrete Slab, Length 16.5 M) Earth Masses: - Excavation (Mainly Rock Decomposition As Well As Weathered And Unweathered Rock): Approx. 5,800 M³ - Installation: Approx. 6,700 M³
Contact Information
Contact No.
000
Email
poststelle@stbats.bayern.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106253739
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.