|
Construction Work – Design And Construction Of The S12 Expressway, Section Wieniawa Junction (Without Junction) - Radom Południe Junction (With Junction). The Order Includes In Particular: 1) Design And Construction Of The S12 Expressway On The Section From The Wieniawa Junction (Without The Junction) To The Radom Południe Junction (With The Junction) On The Section From Approximately Km 29+107 (In Accordance With The Mileage Of The Decision On Environmental Conditions Of January 10, 2023, No. Dooś-Wdśoo.420.78.2021.Kn.25) Up To Km Approximately 1+080 (In Accordance With The Mileage Of The Decision On Environmental Conditions Of November 19, 2024, No. Wooś-Ii.420.70.2021.Mbr.83) To The Border Of The Plot Of The Municipal Road Dg3506603w With A Cross-Section Of 2 Roads With Two Traffic Lanes And An Emergency Lane, Along With Engineering Structures, Accompanying Infrastructure And Safety Devices Traffic, I.E. Development Of Design, Technical And As-Built Documentation Based On The Employers Requirements Included In The Swz, 2) Obtaining On Behalf Of And On Behalf Of The Employer All Legally Required Opinions, Arrangements, Permits, Permits, Administrative Decisions Necessary To Design And Implement The Investment And The Occupancy Permit, 3) Implementation Of Works On The Section From The Wieniawa Junction (Without The Junction) From Km 29+107 To Km Approx. 1+080 Along With The Road Junction Radom Południe At The Intersection With The Existing S7 Expressway And A Provincial Road, And In Particular The Following Construction Works Should Be Designed And Performed: A) Construction Of An Expressway, B) Reconstruction Of Existing Roads In The Scope Of Collisions With The Expressway, Construction Of Roads Other Than The Expressway In Order To Restore Damaged Road Connections And Provide Access To The Property, Construction Of Additional Roads, C) Infrastructure For Pedestrians And Cyclists, D) Emergency Crossings And Exits, Entrances And Emergency Exits To The Motorway, E) Service Lanes, F) Engineering Structures Along The Expressway And Along The Roads Intersecting With The Expressway, G) Area Drainage System, Including Road Body Drainage Devices: Road Ditches, Rainwater Drainage, Pre-Treatment Devices, Retention Reservoirs And Others, H) Environmental Protection Devices, In Particular: Acoustic Protection, Animal Crossings, Ecological Culverts With Protective And Guiding Fencing, Highway Fencing, Greenery, Anti-Glare Screens, I) Infrastructure For Facilities Near The Motorway, Including: Power Supply And Lighting Networks, Water Supply Networks, Sewage Treatment Networks And Devices, Rainwater Sewage System With Pre-Treatment Devices And Others, J) Reconstruction Of Conflicting Devices And Networks Of Existing Underground And Above-Ground Infrastructure: Telecommunication And Energy Devices, Water Supply Networks, Rainwater And Sewage Disposal Systems, Gas Networks, Devices Drainage, Hydrological And Other, K) Demolition Of Structures Colliding With The Investment, Including Demolition Of Residential, Farm And Livestock Buildings As Well As Accompanying Infrastructure, L) Demolition Of Existing Surfaces, Including: Roads, Sidewalks, M) Telecommunications Network For The Needs Of The Ordering Party
|