Architectural And Related Services – Development B-Plan 123 - General Planning Services. The Municipality Of Henstedt-Ulzburg Plans To Implement The Development Of The Development Plan B 123 “Commercial Area West Of Große Heidekoppel”, 2Nd Amendment. The Areas Of Development Plan No. 123, 2Nd Amendment Are Part Of The Ulzburg Industrial Area. The Area Borders On Heideweg To The South, To The East On The Areas Of B-Plans No. 76 And 83, To The North On The Area Of B-Plan 123, 1St Amendment And To The West On The Areas Of B-Plan 146. The Areas Are Currently Still Used For Agriculture. The Designations In The Development Plan Created The Conditions For The Development And Commercial Development Of The Areas. The Drainage For The Retention And Treatment Of The Resulting Rainwater Is Carried Out Via The Drainage Into The Existing Rain Retention Basin “Siebenstücken” North Of The Motorway Access Road. It Is Planned To Divert Rainwater From The Construction And Traffic Areas Via Newly Constructed Rw Canals With Diameters Dn 500 To Dn 1400. The New Rw Sewers To Be Constructed Will Be Laid Within The Planned Access Road And Paths. From The Bend In The Northern Cul-De-Sac, The Rw Line Is Laid In The Area Of The Cycle Path Parallel To The Bend On The Western Side In A Northerly Direction Until Just Before The Motorway Slip Road (L326). Here There Is A Connection To The Existing Rw Canal, Which Was Created In Connection With The Development Of B-Plan 146 In The Area Of The Hiking Trail Along The Motorway Access Road. Local Infiltration Of The Resulting Rainwater Is Not Planned Due To The Poor Infiltration Suitability Of The Existing Soil Conditions. The Drainage Of The Wastewater Is Planned Using Da 200 Gravity Pipes With Connections To The Existing Wastewater Pipes On Lise-Meitner-Straße In The Western And Eastern Areas. The Adequate Hydraulic Dimensioning Of The Planned Rain And Waste Water Sewer System Must Be Checked And Proven As Part Of The Planning Work. In Addition, A Concept Must Be Created To Intercept The Existing Field Drainage That Is Interrupted As Part Of The Development Measure. The Access Road And The Newly Constructed Cycle Path With A Connection To Heideweg In The South And To The Heidekoppel/L 326 Road Junction (Motorway Feeder Road) In The South Are Planned To Be Constructed Using Asphalt. For The Production Of Public Lighting, A Lighting Point Calculation Must Be Created As Part Of The Planning. Local Construction Supervision Should Be Processed As A Special Service. The Other Special Services Can Be Found In Detail In The Documents. During The Planning Process, Appointments Are Required For Project Presentations In The Committees Of The Henstedt-Ulzburg Municipality. For This Purpose, Powerpoint Presentations Must Be Prepared And Presented At Committee Meetings. Details Of The Development Plan Can Be Viewed At The Following Link Https://Www.Henste
Contact Information
Address
Rathausplatz 1
Contact No.
+49 4193 9630
Email
gemeinde@h-u.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105816262
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.