|
Tender For UPGRADATION OF RDD FOOD GODOWN - Earth Work In Excavation By Manaul Means In Trenches For Foundations, Drains, Pipes, Cables Etc. (Not Exceeding 1.5 M In Width) And For Shafts, Wells, Cesspits And The Like Not Exceeding 10 Sqm On Plan, Including Dressing Of Sides And Ramming Of Bottoms Lift Upto 1.5 M, Including Getting Out Excavated Earth And Disposal Of Surplus Excavated Earth As Directed, Within A Lead Of 50 Metres , Providing And Laying Of Stone Soling Hand Packed In Foundation Trenches Including Dressing Watering Compacting And All Carriage Upto Site Work Complete Job , Providing And Laying In Position Cement Concrete Of M10 Grade With 20Mm N/S Crushed Aggregate Includingcuring But Excluding The Cost Of Centring And Shuttering. , Centering And Shuttering Including Strutting, Propping Etc And Removal Of Form Work. , Brick Work With Common Burnt Clay Fps (Non-Modualar) Bricks Of Class Designation 7.5 In Foundation And Plinth Upto Floor V Level In Cement Mortar 1:6 (1 Cement: 6 Coarse Sand) Excld.Carriage Of Bricks , Demolishing Brick Work Manually/By Mechanical Means Including Stacking Of Serviceable Material And Disposal Of Unserviceable Material Within 50 Meters Lead As Per Direction Of Engineer In-Charge: In Cement Mortar , Providing Wood Work In Frames Of Doors, Windows, Clerestory Windows And Other Frames, Wrought Framed And Fixed In Position With Hold Fast Lugs Or With Dash Fasteners Of Required Dia And Length.Complete Job: Kd Wood , Providing And Fixing Glazed Shutters For Doors, Windows And Clerestory Windows Including 4Mm Thick Float Glass Panes Including Isi Marked M.S. Pressed Butt Hinges Bright Finished Of Required Size With Necessary Screws. 35Mm Kd Wood , Providing And Fixing Panelled Or Panelled And Glazed Shutters For Doors,Windows And Clerestory Windows Fixing With Butt Hinges Of Required Size With Necessary Screws, Excluding Panelling Which Will Be Paid For Separately, All Complete As Per Direction Of Engineer-In-Charge. , Providing And Fixing Of Glass Panes Of 5 Mm Thickness Incl Beading Charges , Providing And Fixing False Ceiling At All Height Including Providing And Fixing Of Frame Work Made Of Special Sections, Power Pressed From M.S Sheets And Galvanized With Zinc Coating Of 120 Gms/Sqm (Both Side Inclusive) As Per Is:277 And Consisting Of Angle Cleats Of Size 25 Mm Widex1.6Mm Thick With Flanges Of 27Mm And 37 Mm, At 1200 Mm Centre To Centre, One Flange Fixed To The Ceiling With Dash Fastener 12.5 Mm Dia X40mm Long With 6 Mm Dia Bolts, Other Flange Of Cleat Fixed To The Angle Hangers Of 25X10x0.5Mm Of Required Length With Nuts & Bolts Of Required Size And Other End Of Angle Hanger Fixed With G.I. Channels 45X15x0.9 Mm Running At The Spacing Of 1200 Centre To Centre, To Which The Ceiling Section 0.5Mm Thick Bottom Wedge Of 80Mm With Tapered Flanges Of 26 Mm Each Having Clips Of 10.5 Mm At 450Mm Centre To Centre, Shall Be Fixed In A Direction Perpendicular To G.I. Intermediate Channel With Connecting Clips Made Out Of 2.64Mm Diax230 Mm Long G.I. Wire At Every Junction, Including Fixing Perimeter Channels 0.5Mm Thick 27Mm High Having Flanges Of 20Mm And 30 Mm Long, The Perimeter Of Ceiling Fixed To Wall/Partition With The Help Of Rawl Plugs At 450 Mm Centre To Centre, With 25Mm Long Drive-All Screws @ 230 Mm Interval ,Including Fixing Of Gypsum Board/Calcium Silicate Board To Ceiling Section And Perimeter Channel With The Help Of Dry Wall Screws Of Size 3.5X25mm At 230Mm C/C, Including Jointing And Finishing To A Flush Finish Of Tapered And Square Edges Of The Gypsum Board With Recommended Jointing Compound, Jointing Tapes, Finishing With Jointing Compound In 3 Layers Covering Upto 150Mm On Both Sides Of Joint And Two Coats Of Primer Suitable For Board, All As Per Manufacturers Specification And Also Including The Cost Of Making Openings For Light Fittings, Grills Diffusers, Cutouts Made With Frame Of Perimeter Channels Suitably Fixed All Complete As Per Drawing And Specification And Direction Of The Engineer-In-Charge But Excluding The Cost Of Painting With: 12.5 Mm Thick Tapered Edge Gypsum Fire Resistant Board Conforming To Is: 2095- Part-I : 2011 , Providing And Fixing Of Hardware Fittings Of Approved Brand All Complete , White Washing With Lime To Give An Even Shade On New Work (Three Or More Coats) , Finishing Exterior Walls With Water Proofing Cement Paint Of Approved Brand And Manufacture And Of Required Shade To Give An Even Shade Two Or More Coats @3.84Kg/10Sqm. , Providing And Fixing Of Plained Eaves Boaring Of Budloo Wood 250X32mm (Complete Job) , Providing And Fixing Soffit In Chajja With Necessary Nails Etc Cut And Fixed In Position. , Wall Painting With Acrylic Emulsion Paint Of Approved Brand And Manufacture To Give An Even Shade. Two Or More Coats On New Work , Reinforced Cement Concrete Work In Beams, Suspended Floors, Roofs Having Slope Upto 15°, Landings, Balconies, Shelves, Chajjas, Lintels, Bands, Plain Window Sills, Staircases And Spiral Stair Cases Upto Five Level Including Curing But Excluding The Cost Of Centring, Shuttering, Finishing And Reinforcement With 1:1½:3 (1 Cement : 1½ Coarse Sand : 3 Graded , Steel Reinforcement For Reinforced Cement Concrete Work Including Straightening, Cutting, Bending, Placing In Position And Binding All Complete Upto Plinth Level (Mild Steel And Medium Tensile Steel Bars) , Structural Steel In Frames, Truses Etc Including Hoisting, Fixing In Position And Applying A Priming Coat Of Approved Steel Primer All Complete. , Add Provision For Electrification All Complete , Carriage Of Materials By Mechanical Transport Including Loading, Unloading And Stacking , Providing And Fixing Of Cib Sign Board And Photograph And Other Unforeseen Items
|