|
Supply Of Supply, Erection, Commissioning And Testing Of Igbt Based 3-Phase Drive Propulsion Equipment With Physical Medium I.E. Esd/Emd/Ofg For Multi-Functional Vehicle Bus (Mvb) As Per Iec 61375, Terminal Bracket, Bus Bar Link And Cu Braid Required For Connection Between Main Transformer And Traction Converter, Auxiliary Converter, Interfacing Connectors, Cables And Cable Loom Required For Connection From Vcu 1/2 To Sb1/2 Panel. As Per Specification No. I)Rdso/2008/El/Spec/0071, Rev.5 For Igbt Based 3-Phase Drive Propulsion Equipment, Ii) Clw/Es/3/0458 Alt.E Or Latest For Control Cables Iii) Clw/Es/3/0459 Alt.C Or Latest For Screened Cable Iv) Clw/Es/3/0124 Alt.O Or Latest. The Detailed Scope For Erection Is Enclosed At Annexure-A. Note: -The Scope Shall Also Include The Removal Of All Existing Gto-Based Equipment, Viz. Burs, Srs, And Vcus Etc., Directly Related To The Provision Of The Igbt-Based 3-Phase Drive Propulsion System With Physical Medium, As Required For The Integration Of The New Equipment. The Detailed Scope For Erection Is Enclosed At Annexure-A. Associated Equipment Removed During The Replacement From Gto To Igbt Shall Be Refitted (As Per The Site Engineers Guidelines), As Necessary, To Ensure Proper Functioning Of The Igbt Propulsion System. The Firm Shall Ensure That, Upon Completion, The Propulsion System Is Fully Functional In All Respects. All Works And Accessories Necessary To Achieve This Objective, Whether Explicitly Mentioned Herein Or Not, Shall Be Deemed To Be Included In The Scope.(Documents Attached)Supply, Erection, Commissioning And Testing Of Igbt Based 3-Phase Drive Propulsion Equipment With Physical Medium I.E. Esd/Emd/Ofg For Multi-Functional Vehicle Bus (Mvb) As Per Iec 61375, Terminal Bracket, Bus Bar Link And Cu Braid Required For Connection Between Main Transformer And Traction Converter, Auxiliary Converter, Interfacing Connectors, Cables And Cable Loom Required For Connection From Vcu 1/2 To Sb1/2 Panel. As Per Specification No. I)Rdso/2008/El/Spec/0071, Rev.5 For Igbt Based 3-Phase Drive Propulsion Equipment, Ii) Clw/Es/3/0458 Alt.E Or Latest For Control Cables Iii) Clw/Es/3/0459 Alt.C Or Latest For Screened Cable Iv) Clw/Es/3/0124 Alt.O Or Latest. The Detailed Scope For Erection Is Enclosed At Annexure-A. Note: -The Scope Shall Also Include The Removal Of All Existing Gto-Based Equipment, Viz. Burs, Srs, And Vcus Etc., Directly Related To The Provision Of The Igbt-Based 3-Phase Drive Propulsion System With Physical Medium, As Required For The Integration Of The New Equipment. The Detailed Scope For Erection Is Enclosed At Annexure-A. Associated Equipment Removed During The Replacement From Gto To Igbt Shall Be Refitted (As Per The Site Engineers Guidelines), As Necessary, To Ensure Proper Functioning Of The Igbt Propulsion System. The Firm Shall Ensure That, Upon Completion, The Propulsion System Is Fully Functional In All Respects. All Works And Accessories Necessary To Achieve This Objective, Whether Explicitly Mentioned Herein Or Not, Shall Be Deemed To Be Included In The Scope.(Documents Attached),Supply, Erection, Commissioning And Testing Of Igbt Based 3 Phase Drive Propulsion Equi Pment With Physical Medium I.E. Esd/Emd/Ofg For Multi-Functional Vehicle Bus (Mvb) As Per Iec 61375, Terminal Bracket, Bus Bar Link And Cu Braid Required For Connection Between Main Transformer And Tracti On Converter, Auxiliary Converter, Interfacing Connectors, Cables And Cable Loom Required For Connection From Vcu 1/2 To Sb1/2 Panel. As Per Specification No. I)Rdso/2008/El/Spec/0071, Rev.5 For Igbt Based 3-Phase Drive Propulsion Equipment, Ii) Clw/Es/3/0458 Alt.E Or Latest For Control Cables Iii) Clw/Es/3/ 0459 Alt.C Or Latest For Screened Cable Iv) Clw/Es/3/0124 Alt.O Or Latest. The Detailed Scope For Erecti On Is Enclosed At Annexure-A. Note: -The Scope Shall Also Include The Removal Of All Existing Gto-Based Equipment, Viz. Burs, Srs, And Vcus Etc., Directly Related To The Provision Of The Igbt-Based 3-Phase Dr Ive Propulsion System With Physical Medium, As Required For The Integration Of The New Equipment. The Detailed Scope For Erection Is Enclosed At Annexure-A. Associated Equipment Removed During The Replac Ement From Gto To Igbt Shall Be Refitted (As Per The Site Engineers Guidelines), As Necessary, To Ensur E Proper Functioning Of The Igbt Propulsion System. The Firm Shall Ensure That, Upon Completion, The Pr Opulsion System Is Fully Functional In All Respects. All Works And Accessories Necessary To Achieve This Ob Jective, Whether Explicitly Mentioned Herein Or Not, Shall Be Deemed To Be Included In The Scope. (Docu Ments Attached) [ Warranty Period: 72 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitte D: Max 8 Lacs ] ] , Comprehensive Annual Maintenance Contract [Amc] Of Igbt Based 3-Phase Drive Propuls Ion Equipment To Specn. No. Clw/Amc/C-D&D/01 Issued In March-2016. Amc Period: 3 Years.(Camc An Nexure Attached) [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitte D: Max 8 Lacs ] ]
|