1. The Subject Of The Order Is The Performance Of Construction Works In Order To Implement The Investment Called Construction Of The Municipal Road Ul. Szlachecka And Słowiańska In Dąbrówka Nowa - Stage Ii.2. The Scope Of Works Includes The Execution Of Construction Works In The Scope Described In The Design Documentation, Which Constitutes Annex No. 6 To The Swz, On The Road Section From 0+430 To Km 1+217. The Order Includes The Expansion Of The Municipal Road Ul. Szlachecka And Ul. Słowiańska In The Part Running From Km 0+430 To Km 1+217. The Road Covered By The Study Runs Through Residential Areas. There Is Little Local Traffic On The Mentioned Road. The Section In Question Is Fully Accessible From The Adjacent Area Via Exits. The Existing Width Of The Road In The Boundary Lines Is 5.00 - 10.00 M. Currently, The Road Has An Improved Surface Made Of Unbound Aggregate, 4.00 - 5.00 M Wide, In Poor Technical Condition. The Entire Section Of The Road Runs At Ground Level And On A Small Embankment. The Road Is Drained In An Unorganized Manner Onto The Roadside, Slopes And Adjacent Area. The Expansion Project Includes The Construction Of A Road Surface With A Width Of 5.00 M, For Traffic Category Kr 1, Shoulder Width 0.75 M, Construction Of Exits And Sidewalks - Access To Gates, Construction Of Roadsides, Construction Of Rainwater Drainage, Construction Of Slopes, Construction Of Sections Of Land Utilities Network, Construction Of Speed Bumps, Construction Of A Service Channel And Reconstruction Of Energy Infrastructure. In Order To Arrange The Green Areas, The Area Will Be Planted With Topsoil And The Slopes Will Be Sown With Grass. 1) In The Field Of The Road Industry: - Performance Of Measurement Works, - Performance Of Demolition Works And Removal Of Topsoil, - Performance Of Cable Protection, - Performance Of Earthworks, - Performance Of The Foundation Of The Binding And Wearing Course, - Construction Of Exits And Sidewalks - Access To Gates, - Planting Of Green Areas, Topsoil, Sowing, - Construction Of Speed Bumps From Concrete Paving Stones, - Construction Of Vertical And Horizontal Markings, Construction Road: The Road Has Been Designed With An Asphalt Concrete Surface For Traffic Kr-1 With The Following Structure: - 4 Cm Wearing Course Of Ac 0/11 Mm Asphalt Concrete, - Sprinkling The Base With Asphalt Emulsion, - 5 Cm Binder Layer Of Ac 0/16 Mm Asphalt Concrete, - Sprinkling The Base With Asphalt Emulsion, - 20 Cm Base Basic Mixture Made Of A Mixture Unbound With C90/30 Aggregate - 0/31.5. Access Routes: Economic Access Routes Should Be Made To Each Plot. The Grade Of Exits Should Be Adapted To The Road Elements And Entrance Gates. The Slope Of The Exits In Each Place Should Be Adjusted To The Level Of The Existing Terrain In Order To Maintain Smooth Access To The Property. Construction Of The Exits: - 8 Cm Graphite Concrete Paving Stones, - 3 Cm Cement-Sand Ballast 1:4, - 10 Cm Lean Concrete Foundation C 8/10, Edging Of The Exits With A 12*
|