Installation Of Rooftop Safety Railings . Preparation Of Preliminary Shop Drawings And Must Be Approved By School Before Fabrication As-Built Documentation, Coordination Of Construction Activities, And Safety-Related Materials., Professional Engineer Calculations And Endorsements, Including Submissions To The Relevant Authorities; Preparation Of Preliminary Shop Drawings And As-Built Drawings; Coordination Construction Activities, And Compilation Of Safety-Related Materials., Provision Of Public Liability Insurance Of S$1.0M (Pl Insurance To Include School Name In It) And Workmen Injury Compensation Insurance As Well As Statutory Required Documentations And Signages Within One (1) Calendar Week From The Receipt Of Loa., Project Close-Out And Handover Documentation:The Contractor Shall Submit All Relevant Documentation As Part Of Project Close-Out, In Accordance With The Schools Standard Template And Requirements., Site Establishmenta) Hoardings And Barricades B) Signage And Notices, Installation Of New Rooftop Safety Railings: Location #1: Rooftop Of Block B & C - Approx. 188 M, (Optional Item) Installation Of New Rooftop Safety Railings: Location #2, Above Linkbridge Between Block C & D - Approx. 76 M, Authority Submission, Testing And Commissioning, To Provide A 5-Year Warranty Of Aluminum Guardrail System, Commencing After The 12-Month Defects Liability Period (Dlp), Giving A Total Coverage Period Of 6 Years From The Handover Of The Works.
Contact Information
Contact Person
LIU ANLI
Address
121 Dover Road, Singapore 139650
Email
aileenliual@acsindep.edu.sg
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105760140
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.