Milling The Existing Asphalt Pavement Disposing Of Approx. 21,000 M² Of Asphalt Material Collecting, Temporarily Storing And Reinstalling Approx. 4,100 T Of Topsoil. Producing Approx. 1,000 M³ Of Earthen Subsoil. Installing Approx. 6,250 M² Of Geotextile. Producing Approx. 6,250 M² Of Frost Protection Layer (Hks 0/45) (D=15 Cm), Cycle Path Create Approx. 1,300 M³ Of Gravel Base Layer (Hks 0/45) (D=15 Cm), Create Approx. 1,300 M³ Of Asphalt Base Layer (Ac22tn) For Cycle Path (D= 8 Cm), Create Approx. 5,400 M² Of Asphalt Surface Layer (Ac5dn) For Cycle Path (D= 2.5 Cm), Create Approx. 5,400 M² Of Asphalt Binder Layer For Cycle Path (Ac16bs) Create (D = 6Cm In The Middle), Road K2 Create Approx. 15,000 M² Asphalt Surface Layer (Ac8ds) (D = 4 Cm), Road K2 Create Approx. 15,000 M² Shoulders (Width Approx. 0.50 M) (D = 30 Cm), Cycle Path Create Approx. 375 M³ Shoulders (Width Approx. 0.50 M). (D= 45 Cm In The Sea) K2 Approx. 550 M³ Create Guardrails Approx. 600 M
Contact Information
Address
Adenauerplatz 2
Email
submissionen@luenen.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105757464
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.