|
Lot 1 - Implementation Of A Structured, Wired, Category 5E Or Category 6 Network Point, Including Cabling, Terminations, Tests And Standardized Identification, Lot 1 - Certification Service For Singlemode Or Multimode Fiber Optic Cables, With Issuance Of An Optical Test Report (Otdr/Power Meter)., Lot 1 - Fiber Optic Fusion Service With Thermomechanical Fusion Splicing, With Protection, Packaging And Attenuation Tests., Lot 1 - Installation Of Indoor Optical Cable, With Suitable Fixing, Technical Curves And Identification According To Infrastructure Standards., Lot 1 - Installation Of Outdoor Optical Cable On Power Utility Posting, With Launching, Fixing And Technical Reserve., 03/12/2025 - 13:37:53, Lot 1 - Installation Of Dio – Internal Optical Distributor And Splicing Box, With Allocation Of Fibers, Adapters And Internal Organization., Lot 1 - Installation Of Apparent Infrastructure (Electroducts, Conduits, Channels) Per Linear Meter, With Standardized Fixing And Finishing., Lot 1 - Installation And Configuration Of Olt Equipment – Gpon, With Optical Connections, Logical Access, Parameterization And Activation Test., Lot 1 - Installation And Configuration Of Onu Equipment – Gpon, With Binding To Olt Ports, Navigation And Authentication Tests., Lot 1 - Installation And Configuration Of Indoor Wireless Access Point (Access Point), With Fixing, Network Connection And Parameterization., Lot 1 - Installation And Configuration Of Outdoor Wireless Access Point (Access Point), Power Supply And Standard Configuration., Lot 1 - Installation And Configuration Of Passive Optical Splitter (1:N), With Allocation In Splice Boxes Or Dio, Tested And Identified., Lot 1 - Installation And Configuration Of Switch Core With Minimum Capacity Of 40 Gbps, With Logical Connections And Functionality Test., Lot 1 - Installation And Fixation Of Standard 19 Racks, At Heights Of 8U, 12U, 16U, 24U, 32U Or 44U, With Level, Anchoring And Internal Organization., Lot 2 - Preparation Of Technical Report For Projects From 11 To 25 Integrated Points Or Only Logic Or Electrical Points, Lot 2 - Preparation Of Technical Report For Projects From 26 To 35 Integrated Points Or Only Logic Or Electrical Points, Lot 2 - Preparation Of A Technical Report For Projects With 36 To 50 Integrated Points Or Only Logic Or Electrical Points, Batch 2 - Preparation Of A Technical Report For Projects With 51 To 100 Integrated Points Or Only Logic Or Electrical Points, Batch 2 - Preparation Of A Technical Report For Projects With Up To 10 Integrated Points Or Only Logic Or Electrical Points Electrical
|