|
Removal Of Motor Pump From Artesian Wells Located In Rural And Urban Areas Of This Municipality Rural And Urban Areas Of This Municipality., Flow Test (Minimum Of 24 Hours), With Recovery, 03/12/2025 - 14:44:52, Installation Of Monitoring Tube For Measurements Of Static Level And Dynamic Level Of Water In Artesian Wells Located In Rural And Urban Areas Of This Municipality., Installation Of Hydrometers Of Varied Gauges In Well Tubular In Rural And Urban Areas Of This Municipality., Visit Without The Need To Remove A Motor Pump., Interference Test Between Artesian Wells, With Art., Rental Of Isolated Wells (Study Of Groundwater), On Demand., Mobilization And Displacement Of Teams, Equipment, Materials And Tools For Development And Testing Of Deep Well Flow, With Compressor, Drilling In Alluvium And Inconsistent Layers - Hole Diameter: 8, 5, Drilling In Alluvium And Inconsistent Layers - Hole Diameter: 10, Drilling In Alluvium And Inconsistent Layers - Hole Diameter: 12, Drilling In Sound Rock - Hole Diameter: 6, Drilling In Sound Rock - Hole Diameter: 8, Product Chemical For Removing Drilling Fluid And Cleaning Deep Tubular Wells - Supply And Application, Pre-Filter With Crushed Stone, Tubing For Feeding Pre-Filter For Deep Tubular Wells - Supply And Installation, Cementing Of The Annular Space With Cement Mortar And Sand In A 1:3 Ratio, Simple Concrete Slab, Minimum Cement Consumption Of 200 Kg/M³, Thickness = 20Cm, Diameter = 2, 50M, Deep Well Protection Cover In Smooth Black Steel Din2440, Installation And Removal Of Test Pipe, Installation Or Removal Of Coating Of Deep Tubular Wells In Black Carbon, Galvanized Or Stainless Steel Pipes, Galvanized Steel Pipe With Seam, Medium Class, Dn 6. Pine Board, For Foundations, Removal Of Structures, Any Height Or Depth, Technical Visit For Inspection And Issuance Of Diagnosis, Mobilization And Demobilization Of Equipment, Tools, Materials And Personnel For Revitalization And Waterproofing Of Reservoir., Removal Of Objects, Sludge, Waste And Accumulated Debris., Brushing And Washing With Water Under Pressure Throughout Internal Surface., Removal Of Mold, Lime, Salt Crusts And Adhered Dirt., Application Of Disinfectant Solution (E.G.: Sodium Hypochlorite) To Eliminate Microorganisms., Identification Of Fissures, Cracks, Open Joints And Areas Of Disintegration Of Concrete Or Mortar., Checking Of Exposed Reinforcement (In The Case Of A Reservoir In Reinforced Concrete)., Repair Of Cracks And Joints With Polymeric Mortar Or Specific Epoxy/Cement Products For Contact With Drinking Water., Recovery Of Loose Spots, Flaws And Exposed Reinforcement With Structural Repair Mortar., Regularization Of The Surface To Ensure Uniform Adhesion Of The Waterproofing Material., Application Of An Adhesion Bridge Or
|