|
Preliminary Services, Technicians And Construction Administration/ Fees And Mobilization: Crea Or Cau Fee - Technical Responsibility Note (Art) Or Technical Responsibility Record (Rrt), Regarding The Execution Of The Work, Technicians And Construction Administration/ Fees And Mobilization: Mobilization Of Equipment And Personnel For Site Organization, Technicians And Construction Administration/Construction Site: Temporary Installation Of Water And Sewage, Technicians And Construction Administration/Construction Site: Temporary Installation Of Electricity, Air, Three-Phase, On Galvanized Pole, Exclusive Meter Supply, Construction Site: Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, 03/12/2025 - 10:38:51, Construction Site: Siding With Metallic Tile. Af_05/2018, Construction Site: Rent Container/Toilet With 2 Vases/1 Lavat/1 Mic/4 Rain Width=2, 20M Length=6, 20M Height=2, 50M Steel Sheet With Nerv Trapezlining With Thermal/Acoustic Insulation Chassis Reinforced Floor Compensnaval Incl Electr/Hydr Inst Excl Transport/Loading/Unloading, Construction Site: Container Rental/Writing Incl Elet Inst Width=2, 20 Comp=6, 20Malt=2, 50M Steel Plate W/Nerv Trapez Lining W/Isoltermo/Acoustic Chassis Reinforc Floor Compens Naval Exctransp/Loading/Unloading, Construction Site: Container Rental - Warehouse Without Bathroom - 6.00 Af_04/2016, Construction Administration: Waste Management And Disposal (Pgrcc), Considering Open Warehouse For Separation Of Waste By Classes And Disposal In A Licensed Area With Transportation By Tele-Rubble (% Executed)., Construction Administration: Local Construction Administration - Including Civil Engineer Or Architect, Technical Responsible, Master/Foreman Of Works, As Well As Transportation Of Miscellaneous Materials (Paid In Proportion To The Companys Performance In The Portion Considered, According To The Physical-Financial Schedule), Land Cleaning: Mechanized Cleaning Of Vegetation Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), With Track Tractor. Construction Site Area, Foundations In Footings: Conventional Construction Location, Using Template Of Pointed Boards Every 2.00M - 2 Uses. Af_10/2018, Footing Foundations: Mechanized Excavation For Crowning Block Or Footing With Backhoe (Including Excavation For Placing Formwork). Af_06/2017, Footing Foundations: Slim Concrete Ballast, Applied In Decorative Blocks Or Footings, 5 Cm Thick. Af_08/2017, Foundations On Footings: Block Frame, Baldrame Beam Or Footing Using 8 Mm Ca-50 Steel - Assembly. Af_06/2017, Foundations In Footings: Manufacture, Assembly And Dismantling Of Formwork For Footings, In Sawn Wood, E=25 Mm, 2 Uses. Af_06/2017, Foundations In Footings: Concreting Footings, Fck 30 Mpa, Using Concrete Laying, Densification And Finishing. Af_06/2017, Foundation Pillars: Assembly And Disassembly Of Rectangular Pillar Formwork And Similar Structures, Simple Right Foot, 2 Uses. Af_09/2020, Foundation Pillars: Pillar Frame Or Beam Of Conventional Reinforced Concrete Structure Using 5.0 Mm Ca-60 Steel - Assembly. Conventional Structure Pillar Or Beam
|