The Subject Of The Order Is The Expansion, Superstructure And Reconstruction Of The Building Of Primary School No. 2 In Żuromin To Include A Part Intended For A Nursery. The Newly Designed Facility Will Be Connected To The Existing Primary School Building With Internal Doors. The Designed Building Will Have A Compact Rectangular Shape, With A Cutout In The Corner On The North Side. The Roof Was Designed As A Gable Roof, Covered With A Sandwich Panel Based On A Board Truss Structure. The Project Involves The Superstructure And Reconstruction Of The Building Of The Heating Station (Former Boiler Room) Along With The Expansion Of A Room Enabling Access To The Existing Basement. The Designed Superstructure Will Function As A Nursery And Will Not Be Functionally Connected To The Basement. The Basement Segment Will Be Reduced By The South-Eastern Part. The Scope Of Works Includes, Among Others: 1) Construction Works: - Preparatory And Demolition Works, - Earthworks, - Foundation Works, - Insulation Of Existing Foundation Walls, - Construction Works, - External And External Walls, - Window Joinery, External And Internal Door Joinery, - Roof - Structure, Covering Works, - Finishing And Repair Works, - Stairs And Driveways, - Facades, - Equipment: Purchase And Installation Of: Furniture, Equipment Sanitary Equipment, Leisure Equipment, Kitchen Equipment2) Electrical Works: - Power Supply Of The Facility, Installation Of Switchboards, - Switchgear, - Earthing Installation, - Installation Of Lighting And Socket Installations, - Installation Of Fixtures, - Call Installation, 3) Sanitary Works: - Sewerage, - Cold And Hot Water Installation, - Central Heating Installation, - Ducts, Duct Insulation, - Central Ventilation With Heat Recovery, - Ventilation Basement. A Detailed Description Of The Subject Of The Order Is Included In The Annexes To The Swz: App. No. 1 To Swz - Design Documentation Site Development Project, Architectural And Construction Design, Technical Design - Construction Industry Technical Design - Electrical Industry Technical Design - Sanitary Industry App. No. 2 To Swz - Technical Specification For The Execution And Acceptance Of Worksapp. No. 3 To Swz - Bill Of Quantities Bill Of Quantities - Construction Worksbill Of Quantities - Electrical Installationbill Of Quantities - Sanitary Installationsnote: The Attached Bill Of Quantities Is An Auxiliary Material For Calculating The Lump Sum Price Of The Offer, And Any Elements Of The Works Resulting From The Construction Design And Technical Specifications Not Included In Them Cannot Constitute The Basis For The Contractor To Demand Additional Remuneration. Warrantya) For Construction Works, The Contractor Provides A Warranty For The Period Minimum 36 Months From The Date Of Signing The Final Acceptance Protocol Of The Investment By The Parties. Note: The Length Of The Warranty Period For Completed Construction Works Is The Criterion For Evaluating Offers. B) The Warranty Period For Physical And
|