1) The Subject Of The Order Is The Construction Of A Storm Sewage System In The Streets: Okopowa, Weteranów And Hubalczyków In Lubartów, Together With Pre-Treatment Devices And A Retention And Infiltration Tank On Plot No. 146/45, As Well As The Liquidation And Construction Of A New Section Of The Conflicting Sanitary Sewage Network. 2) The Scope Of The Order Includes: A. Construction Of A Storm Sewage System In Okopowa, Weteranów And Hubalczyków Streets In Lubartów, Including: - Demolition Works, - Construction Of A Storm Sewerage Network With Drains, - Installation Of Inspection Wells, - Installation Of Street Inlets, - Protection Of Collisions With Underground Infrastructure. List Of Designed Elements Of The Storm Sewage Network: Rain Sewer System Made Of 400 Mm Pvc Pipes With A Total Length Of 43.6 M. Sewerage Rainwater Drainage System Made Of 315 Mm Pvc Pipes, With A Total Length Of 234.4 M. Rainwater Drainage System Made Of 250 Mm Pvc Pipes, With A Total Length Of 355.0 M. Rainwater Drainage Channels Made Of 200 Mm Pvc Pipes, With A Total Length Of 141.1 M. Concrete Inspection Wells, Dn 1500 Mm, 4 Pcs. Concrete Inspection Wells Dn 1200 Mm, 7 Pcs. Pcs. Plastic Inspection Wells Pcs. Dn 400 Mm, 14 Pcs. Concrete Inspection And Venting Wells Dn 1200 Mm, 2 Pcs. Cast Iron Street Drains With Concrete Settling Tanks Dn 500 Mm, 45 Pcs.B. Construction Of A Pre-Treatment Device And A Retention And Infiltration Tank On Plot No. 146/45 Rev. 1 - Wincentów In Lubartów, Including: - Construction Of A Coalescing Separator With A Settling Tank With A Capacity Of 1500 L - 1 Set, - Construction Of A Retention And Infiltration Tank With Dimensions. 12.0M X 4.8M X 1.82 M – 1 Set, C. Reconstruction Of A Section Of The Sanitary Sewage System Colliding With The Designed Retention And Seepage Tank: - Sanitary Sewage System Made Of Pe Sdr17 Dn200/160Mm Pipes With A Total Length Of 59.8 M, - Dn 1200Mm Concrete Well With A Cast Iron Manhole - 3 Sets.D. Reconstruction Of The Surface Of Okopowa, Weteranów And Hubalczyków Streets: - Reconstruction Of The Road Surface Over The Entire Width, Including Construction Layers, - Reconstruction Of The Surface Of Sidewalks And Exits Over The Entire Width, Together With The Substructure, - Reconstruction Of Green Areas. Summary Of The Area Of Reconstruction Works: Road Area - 3,545 M2 (Asphalt - 3,525 M2, Concrete Cubes - 20 M2) Lanes Curbsides (Sidewalks And Exits) - 425 M Green Areas (Lawns) - 1520 M23) A Detailed Description Of The Subject Of The Order Is Included In The Attached Swz: Land Development Design, Architectural And Construction Design, Detailed Design, Technical Design, Technical Specification For Execution And Acceptance Of Works (Stwior), And Bill Of Quantities.
|