Solar Panels – Construction Of Renewable Energy Sources In The City And Commune Of Włodowice. 1. The Subject Of The Order Is The Preparation Of Design Documentation And Comprehensive Implementation Of The Investment Task Titled: Construction Of Renewable Energy Sources In The City And Commune Of Włodowice. The Order Involves The Design And Implementation Of The Delivery, Assembly And Commissioning Of The Following Installations: Photovoltaic - 51 Pcs., Energy Storage - 51 Pcs. 2. As Part Of The Subject Of The Order, The Contractor Will Perform The Following Works: 1) Design: Inventory Of The Actual Technical Condition Of The Facilities And The Electrical Installations Of The Facilities With A View To Installing Pv Systems. The Activities Will Result In The Preparation Of Installation Arrangement Protocols, Constituting The Basis For The Preparation Of Design Documentation, With The Location Of Photovoltaic Modules On The Roof, Façade Or On The Ground, With The Location Of Installation Of The Hybrid Inverter, Energy Storage Marked, As Well As Containing All Necessary Information Regarding The Scope Of Formalities, Additional Works, Possible Purchases Of Devices Along With An Indication Of Their Parameters, Necessary To Be Performed By The Resident In Order To Enable The Installation Of The Photovoltaic Installation And Its Acceptance By The Local Dsos. The Assembly Agreement Protocol Must Be Signed And Accepted By The Building Owner And The Contractor As Well As Verified By The Supervision Inspector. The Assembly Agreement Protocol Will Specify A Deadline For Adapting The Installation Or Completing Administrative Formalities By The Facility Owner. The Implementation Of The Requirements In Question Is A Necessary Condition For The Contractor To Undertake Assembly Works, Develop Design Documentation For Individual Installations And Agree On It With The Ordering Party And The Supervision Inspector, 2) Installation: Installation Of Supporting Structures For Pv Modules, Installation Of Pv Modules On Supporting Structures, In The Case Of Installation Of Photovoltaic Modules On The Ground, The Contractor Will Be Responsible For Removing The Top Layer (Other Than The Ground), Excavation, Up To 40 Meters In A Straight Line From Photovoltaic Modules To The Building Where The Connection Point To The Electrical Installation Will Be Located, Laying Cabling On The Dc And Ac Side Of The Installation (If The Photovoltaic Modules Are Located On The Ground, The Scope Of Work On The Contractors Part Will Cover A Maximum Of 40 Meters Of Dc Cabling (In The Trench), Counting In A Straight Line From The Photovoltaic Modules To The Building Where The Connection Point To The Electrical Installation Will Be Located), Backfilling The Trench, Leveling And Tamping The Ground, Possible Re-Shrubs Or Laying Of The Top Layer (Other Than The Ground), Modernization Of The Existing Electrical Switchgear In Terms Of Retrofitting It With The Equipment Necessary To Connect A Pv Micro-Installation, Modernization Of The Existing Electrical Switchboard To Technical Regulations On The Users Side - If Necessary, Installation Of A Hybrid Pv Inverter, Installation Of An Energy Storage Facility, Installation Of A Lightning Protection System Or Appropriate Spd Devices And Differential Connections
Contact Information
Address
Krakowska 26
Contact No.
34 315 30 01
Email
urzad@wlodowice.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105695947
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.